IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0367 # 01 Y:2010 01 2010 COVER OPEN TANKS $79,614 $15,421 Implemented
MS0321 # 04 Y:2007 04 2007 INSULATE BARE EQUIPMENT $854 $455 Not Implemented
MS0321 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,742 $306 Implemented
MS0321 # 01 Y:2007 01 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,161 $1,400 Not Implemented
MS0321 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,455 $2,724 Not Implemented
MS0301 # 04 Y:2006 04 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,153 $9,150 Not Implemented
MS0301 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,037 $21,914 Implemented
MS0301 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,625 $30,484 Implemented
MS0301 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $17,310 $21,720 Implemented
MS0301 # 07 Y:2006 07 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $914 $4,882 Not Implemented
MS0301 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,070 $244 Implemented
MS0301 # 05 Y:2006 05 2006 BURN WASTE OIL FOR HEAT $1,477 $2,186 Implemented
MS0272 # 03 Y:2005 03 2005 PAY UTILITY BILLS ON TIME $783 $0 Implemented
MS0272 # 07 Y:2005 07 2005 REPAIR AND ELIMINATE STEAM LEAKS $95 $19 Implemented
MS0272 # 06 Y:2005 06 2005 DISCONNECT BALLASTS $153 $216 Implemented
MS0272 # 05 Y:2005 05 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $424 $1,495 Not Implemented
MS0272 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $569 $151 Implemented
MS0272 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,425 $3,780 Not Implemented
MS0272 # 01 Y:2005 01 2005 $60,336 $15,000 Not Implemented
MS0222 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,928 $196 Implemented
MS0222 # 07 Y:2003 07 2003 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,680 $400 Not Implemented
MS0222 # 06 Y:2003 06 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $1,717 $1,717 Not Implemented
MS0222 # 01 Y:2003 01 2003 PREHEAT COMBUSTION AIR WITH WASTE HEAT $11,730 $8,788 Not Implemented
MS0222 # 05 Y:2003 05 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,994 $0 Not Implemented
MS0222 # 04 Y:2003 04 2003 USE RADIANT HEATER FOR SPOT HEATING $2,158 $1,649 Not Implemented