IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,985

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0360 # 02 Y:2024 02 2024 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $8,851 $11,852 Not Implemented
MZ0360 # 01 Y:2024 01 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,834 $5,300 Not Implemented
MZ1004 # 01 Y:2024 01 2024 INSULATE BARE EQUIPMENT $971 $598 Implemented
MZ1004 # 02 Y:2024 02 2024 INSTALL OCCUPANCY SENSORS $227 $250 Implemented
MZ1004 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,256 $21,075 Implemented
MZ1004 # 04 Y:2024 04 2024 REPLACE BOILER $15,382 $100,750 Not Implemented
MZ1003 # 01 Y:2024 01 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $542 $1,660 Not Implemented
MZ1003 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $10,196 $78,000 Not Implemented
MZ1003 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $349 $1,000 Implemented
MZ1002 # 01 Y:2024 01 2024 INSTALL OCCUPANCY SENSORS $1,926 $1,660 Implemented
MZ1002 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,984 $3,805 Implemented
MZ1002 # 03 Y:2024 03 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,387 $2,260 Not Implemented
MZ1002 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $96 $310 Implemented
MZ0358 # 01 Y:2024 01 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,335 $1,200 Implemented
MZ0358 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,322 $200 Implemented
MZ0358 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $1,050 $2,050 Implemented
MZ0358 # 07 Y:2024 07 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $4,887 $14,220 Not Implemented
MZ0358 # 06 Y:2024 06 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,666 $2,000 Implemented
MZ0358 # 05 Y:2024 05 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,179 $320 Implemented
MZ0358 # 04 Y:2024 04 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,826 $1,760 Implemented
MZ0357 # 06 Y:2024 06 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,080 $8,267 n/a
MZ0357 # 01 Y:2024 01 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,213 $18,604 n/a
MZ0357 # 03 Y:2024 03 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,034 $10,040 n/a
MZ0357 # 02 Y:2024 02 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,288 $440 n/a
MZ0357 # 05 Y:2024 05 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $482 $2,100 n/a