IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

257

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0097 # 07 Y:1996 07 1996 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $657 $100 Not Implemented
NC0097 # 09 Y:1996 09 1996 EXPAND OPERATIONS INTO UNUSED SPACE $13,475 $0 Not Implemented
NC0097 # 05 Y:1996 05 1996 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $11,779 $11,650 Not Implemented
NC0097 # 06 Y:1996 06 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $488 $210 Not Implemented
NC0097 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $486 $245 Not Implemented
NC0097 # 08 Y:1996 08 1996 INSTALL SYSTEM TO COLLECT SCRAP $20,250 $1,000 Not Implemented
NC0097 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,021 $2,451 Not Implemented
NC0097 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $469 $772 Not Implemented
NC0097 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $138 $700 Not Implemented
NC0105 # 07 Y:1996 07 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,655 $5,125 Not Implemented
NC0105 # 06 Y:1996 06 1996 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,508 $3,000 Implemented
NC0105 # 08 Y:1996 08 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,562 $5,464 Not Implemented
NC0105 # 09 Y:1996 09 1996 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $702 $500 Not Implemented
NC0105 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,316 $5,062 Not Implemented
NC0105 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $449 $2,100 Not Implemented
NC0105 # 04 Y:1996 04 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,194 $1,520 Not Implemented
NC0105 # 05 Y:1996 05 1996 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,174 $11,500 Not Implemented
NC0105 # 10 Y:1996 10 1996 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $826 $500 Not Implemented
NC0105 # 02 Y:1996 02 1996 INSTALL OCCUPANCY SENSORS $1,852 $375 Not Implemented
NC0105 # 11 Y:1996 11 1996 CONTRACT A WOOD PALLET RECYCLING COMPANY $225 $200 Not Implemented
NC0104 # 06 Y:1996 06 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,451 $25,000 Not Implemented
NC0104 # 02 Y:1996 02 1996 USE PHOTOCELL CONTROLS $1,117 $630 Implemented
NC0104 # 04 Y:1996 04 1996 INSTALL / REPAIR INSULATION ON STEAM LINES $1,717 $2,017 Implemented
NC0104 # 07 Y:1996 07 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,733 $2,720 Implemented
NC0104 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,017 $2,816 Implemented