IAC logo
IAC Assessment: NC0097
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0097
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1996
Principal Product Boxes
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 120,000
Annual Production 50,000,000 Pieces
Production Hrs. Annual 5,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $35,829 1,092,321 kWh $0.03
Electricity Demand $27,545 3,299 kW-months/year $8.35
Electricity Fees $2,551 - $ -
Natural Gas $27,996 5,197 MMBtu $5.39
TOTAL ENERGY COSTS $94,578
RECOMMENDED SAVINGS* $50,763 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,021
Cost:
$2,451
$1,744 53,048 $1,277 153 - - - - - - - - - - $1,744
53,048
kWh
$1,277
153
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$138
Cost:
$700
$65 2,052 $23 3 - - - - - - - - $50 - $65
2,052
kWh
$23
3
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
$50
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$469
Cost:
$772
$286 8,792 $183 22 - - - - - - - - - - $286
8,792
kWh
$183
22
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$486
Cost:
$245
$302 9,086 $184 22 - - - - - - - - - - $302
9,086
kWh
$184
22
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$11,779
Cost:
$11,650
- - - - $11,779 2,185 - - - - - - - - -
-
kWh
-
-
kW-months/year
$11,779
2,185
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$488
Cost:
$210
$303 9,086 $185 22 - - - - - - - - - - $303
9,086
kWh
$185
22
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
07: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$657
Cost:
$100
- - - - - - $657 43,800 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$657
43,800
lb
-
-
$
-
-
$
-
-
$
08: 4.4440 INSTALL SYSTEM TO COLLECT SCRAP Savings:
$20,250
Cost:
$1,000
- - - - - - - - $20,250 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$20,250
-
$
-
-
$
-
-
$
09: 4.5110 EXPAND OPERATIONS INTO UNUSED SPACE Savings:
$13,475
Cost:
-
$745 22,860 $451 54 $1,011 188 - - - - $11,268 - - - $745
22,860
kWh
$451
54
kW-months/year
$1,011
188
MMBtu
-
-
lb
-
-
$
$11,268
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$50,763
Cost:
$17,128
$3,445 104,924 $2,303 276 $12,790 2,373 $657 43,800 $20,250 - $11,268 - $50 - $3,445
104,924
kWh
$2,303
276
kW-months/year
$12,790
2,373
MMBtu
$657
43,800
lb
$20,250
-
$
$11,268
-
$
$50
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost