Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
280
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NT0050 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,369 | $56,820 | n/a |
NT0050 # 05 Y:2025 | 05 | 2025 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $2,692 | $7,518 | n/a |
NT0050 # 01 Y:2025 | 01 | 2025 | PURCHASE EQUIPMENT INSTEAD OF LEASING | $359,441 | $504,900 | n/a |
NT0050 # 02 Y:2025 | 02 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $118,800 | $170,000 | n/a |
NT0050 # 04 Y:2025 | 04 | 2025 | PURCHASE EQUIPMENT INSTEAD OF LEASING | $13,978 | $7,020 | n/a |
NT0049 # 06 Y:2025 | 06 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $19,372 | $5,000 | n/a |
NT0049 # 03 Y:2025 | 03 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,840 | $0 | n/a |
NT0049 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,061 | $5,609 | n/a |
NT0049 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $79,073 | $292,302 | n/a |
NT0049 # 02 Y:2025 | 02 | 2025 | INSULATE BARE EQUIPMENT | $7,764 | $7,308 | n/a |
NT0049 # 05 Y:2025 | 05 | 2025 | OPTIMIZE PLANT POWER FACTOR | $14,101 | $17,176 | n/a |
NT0047 # 02 Y:2025 | 02 | 2025 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $89,410 | $0 | n/a |
NT0047 # 04 Y:2025 | 04 | 2025 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $61,852 | $120,692 | n/a |
NT0047 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $25,099 | $4,224 | n/a |
NT0047 # 05 Y:2025 | 05 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $26,918 | $27,300 | n/a |
NT0047 # 03 Y:2025 | 03 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $87,586 | $164,542 | n/a |
NT0047 # 07 Y:2025 | 07 | 2025 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,083 | $1,434 | n/a |
NT0047 # 01 Y:2025 | 01 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $166,705 | $320,438 | n/a |
NT0047 # 08 Y:2025 | 08 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $852 | $0 | n/a |
NT0048 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,298 | $0 | n/a |
NT0048 # 05 Y:2025 | 05 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $20,312 | $55,710 | n/a |
NT0048 # 03 Y:2025 | 03 | 2025 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $998 | $1,346 | n/a |
NT0048 # 06 Y:2025 | 06 | 2025 | OPTIMIZE PLANT POWER FACTOR | $7,122 | $25,622 | n/a |
NT0048 # 07 Y:2025 | 07 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $321,458 | $5,000 | n/a |
NT0048 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,633 | $5,609 | n/a |