IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OD0149 # 05 Y:1999 05 1999 RECOVER AND REUSE COOLING WATER $17,077 $10,098 Not Implemented
OD0149 # 04 Y:1999 04 1999 METER WASTE WATER $3,741 $4,595 Not Implemented
OD0149 # 03 Y:1999 03 1999 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,940 $1,972 Not Implemented
OD0149 # 02 Y:1999 02 1999 REPAIR OR REPLACE STEAM TRAPS $10,071 $450 Not Implemented
OD0149 # 01 Y:1999 01 1999 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $26,618 $64,698 Not Implemented
OD0113 # 03 Y:1998 03 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,820 $1,091 Implemented
OD0113 # 07 Y:1998 07 1998 OPTIMIZE PLANT POWER FACTOR $9,036 $50,000 Implemented
OD0113 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,794 $14,284 Implemented
OD0113 # 05 Y:1998 05 1998 REDUCE VENTILATION AIR $1,897 $0 Not Implemented
OD0113 # 04 Y:1998 04 1998 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $209 $250 Not Implemented
OD0113 # 02 Y:1998 02 1998 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $15,720 $21,621 Implemented
OD0113 # 01 Y:1998 01 1998 ELIMINATE/REDUCE AN OPERATION $22,713 $0 Not Implemented
OD0084 # 01 Y:1997 01 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,338 $25,270 Not Implemented
OD0084 # 08 Y:1997 08 1997 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $28,563 $11,432 Implemented
OD0084 # 07 Y:1997 07 1997 BURN WASTE OIL FOR HEAT $2,284 $3,402 Not Implemented
OD0084 # 06 Y:1997 06 1997 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,546 $1,110 Not Implemented
OD0084 # 05 Y:1997 05 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,624 $1,495 Implemented
OD0084 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,487 $1,724 Implemented
OD0084 # 03 Y:1997 03 1997 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $1,617 $4,378 Not Implemented
OD0084 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $818 $589 Implemented