IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

169

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0362 # 05 Y:1991 05 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,215 $0 Implemented
OK0361 # 07 Y:1991 07 1991 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,356 $4,600 Not Implemented
OK0361 # 03 Y:1991 03 1991 INSTALL TIMERS AND/OR THERMOSTATS $3,012 $1,050 Not Implemented
OK0361 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $756 $0 Not Implemented
OK0361 # 05 Y:1991 05 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,198 $107 Not Implemented
OK0362 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,858 $0 Implemented
OK0362 # 03 Y:1991 03 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $567 $0 Implemented
OK0362 # 01 Y:1991 01 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $191 $453 Implemented
OK0362 # 02 Y:1991 02 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $439 $0 Implemented
OK0361 # 01 Y:1991 01 1991 RECOVER WASTE HEAT FROM EQUIPMENT $307 $403 Not Implemented
OK0361 # 04 Y:1991 04 1991 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,521 $13,526 Not Implemented
OK0361 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,285 $0 Not Implemented
OK0362 # 07 Y:1991 07 1991 OPTIMIZE PLANT POWER FACTOR $7,037 $4,975 Implemented
OK0362 # 04 Y:1991 04 1991 INSULATE BARE EQUIPMENT $441 $473 Implemented
OK0360 # 03 Y:1991 03 1991 RECOVER WASTE HEAT FROM EQUIPMENT $2,917 $1,000 Implemented
OK0360 # 01 Y:1991 01 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,269 $135 Implemented
OK0360 # 02 Y:1991 02 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,965 $0 Implemented
OK0358 # 02 Y:1991 02 1991 RECOVER WASTE HEAT FROM EQUIPMENT $2,237 $980 Not Implemented
OK0358 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,595 $4,357 Not Implemented
OK0359 # 02 Y:1991 02 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,656 $0 Implemented
OK0358 # 01 Y:1991 01 1991 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $2,955 $19,500 Not Implemented
OK0357 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,560 $0 Not Implemented
OK0359 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,638 $0 Implemented
OK0357 # 01 Y:1991 01 1991 RECOVER WASTE HEAT FROM EQUIPMENT $969 $1,070 Not Implemented
OK0357 # 03 Y:1991 03 1991 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $748 $500 Not Implemented