IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

283

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0100 # 09 Y:1994 09 1994 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $89 $50 Implemented
SD0100 # 08 Y:1994 08 1994 USE PHOTOCELL CONTROLS $2,123 $1,278 Not Implemented
SD0100 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $93 $140 Implemented
SD0100 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,131 $7,029 Not Implemented
SD0100 # 04 Y:1994 04 1994 INSULATE BARE EQUIPMENT $405 $43 Implemented
SD0100 # 02 Y:1994 02 1994 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,434 $2,000 Implemented
SD0100 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $206 $380 Not Implemented
SD0100 # 06 Y:1994 06 1994 INSTALL SPECTRAL REFLECTORS / DELAMP $4,373 $3,675 Implemented
SD0100 # 07 Y:1994 07 1994 INSTALL OCCUPANCY SENSORS $1,542 $607 Not Implemented
SD0099 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,306 $7,840 Implemented
SD0099 # 03 Y:1994 03 1994 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $47,221 $10,000 Not Implemented
SD0099 # 04 Y:1994 04 1994 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $58,207 $132,600 Not Implemented
SD0099 # 02 Y:1994 02 1994 RECOVER WASTE HEAT FROM EQUIPMENT $28,013 $50,500 Not Implemented
SD0098 # 03 Y:1994 03 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,212 $15,000 Implemented
SD0098 # 01 Y:1994 01 1994 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $15,610 $32,459 Not Implemented
SD0098 # 04 Y:1994 04 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $104 $27 Not Implemented
SD0098 # 02 Y:1994 02 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,808 $5,000 Implemented
SD0098 # 06 Y:1994 06 1994 INSTALL OCCUPANCY SENSORS $177 $353 Not Implemented
SD0098 # 05 Y:1994 05 1994 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,627 $225 Not Implemented
SD0097 # 05 Y:1994 05 1994 INSTALL SPECTRAL REFLECTORS / DELAMP $1,331 $2,205 Implemented
SD0097 # 02 Y:1994 02 1994 INSULATE BARE EQUIPMENT $746 $1,350 Not Implemented
SD0097 # 06 Y:1994 06 1994 INSTALL SPECTRAL REFLECTORS / DELAMP $439 $560 Not Implemented
SD0097 # 09 Y:1994 09 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $232 $165 Not Implemented
SD0097 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $336 $353 Not Implemented
SD0097 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $613 $300 Implemented