IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

69

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0410 # 10 Y:2012 10 2012 INSTALL OCCUPANCY SENSORS $24,022 $71,940 Implemented
SF0410 # 01 Y:2012 01 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $33,835 $0 Implemented
SF0410 # 02 Y:2012 02 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,290 $129 Implemented
SF0410 # 03 Y:2012 03 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,966 $1,452 Implemented
SF0410 # 04 Y:2012 04 2012 REDUCE FLUID FLOW RATES $20,646 $4,715 Implemented
SF0410 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $156,563 $70,219 Implemented
SF0410 # 06 Y:2012 06 2012 REDUCE FLUID FLOW RATES $41,557 $33,080 Implemented
SF0410 # 07 Y:2012 07 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $121,698 $165,923 Implemented
SF0410 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $86,008 $156,543 Implemented
SF0410 # 09 Y:2012 09 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $178,304 $353,108 Implemented
SF0409 # 02 Y:2012 02 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $53,342 $534 Implemented
SF0409 # 10 Y:2012 10 2012 INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE $14,800 $59,457 Implemented
SF0409 # 09 Y:2012 09 2012 INSTALL OCCUPANCY SENSORS $74,747 $202,884 Implemented
SF0409 # 11 Y:2012 11 2012 UPGRADE CONTROLS ON COMPRESSORS $8,052 $35,258 Implemented
SF0409 # 12 Y:2012 12 2012 INSTALL OCCUPANCY SENSORS $3,894 $18,292 Implemented
SF0409 # 13 Y:2012 13 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,577,025 $18,992,318 Implemented
SF0409 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,464 $40,690 Implemented
SF0409 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,102 $45,593 Implemented
SF0409 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $139,165 $143,802 Implemented
SF0409 # 04 Y:2012 04 2012 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $66,394 $56,875 Implemented
SF0409 # 03 Y:2012 03 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $18,006 $307 Implemented
SF0409 # 07 Y:2012 07 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $22,348 $35,892 Implemented
SF0409 # 01 Y:2012 01 2012 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $382,102 $32,168 Implemented
SF0394 # 03 Y:2011 03 2011 OPTIMIZE PLANT POWER FACTOR $2,952 $3,821 Implemented
SF0394 # 02 Y:2011 02 2011 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $439 $235 Implemented