IAC logo
IAC Assessment: SF0394
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0394
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2011
Principal Product Chocolate
NAICS 311352 - Confectionery Manufacturing from Purchased Chocolate
SIC 2026 - Fluid Milk
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 80,000
Annual Production 20,000,000 Units
Production Hrs. Annual 3,536
Location (State) HI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $225,745 1,313,544 kWh $0.17
Electricity Demand $33,364 4,008 kW-months/year $8.32
Electricity Fees $4,106 - $ -
LPG $22,755 634 MMBtu $35.89
TOTAL ENERGY COSTS $285,970
RECOMMENDED SAVINGS* $25,132 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,130
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Primary Raw Material
$ kWh $ kW-months/year $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,204
Cost:
$73
$1,204 5,350 - - - - - - $1,204
5,350
kWh
-
-
kW-months/year
-
-
$
-
-
$
02: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$439
Cost:
$235
$439 2,001 - - - - - - $439
2,001
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,952
Cost:
$3,821
- - - - $2,952 - - - -
-
kWh
-
-
kW-months/year
$2,952
-
$
-
-
$
04: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$2,879
Cost:
$3,638
$2,879 12,787 - - - - - - $2,879
12,787
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$7,621
Cost:
$11,002
$7,621 33,728 - - - - - - $7,621
33,728
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$7,794
Cost:
$20,780
$7,794 39,582 - - - - - - $7,794
39,582
kWh
-
-
kW-months/year
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$241
Cost:
$700
$104 527 $6 1 - - $131 - $104
527
kWh
$6
1
kW-months/year
-
-
$
$131
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,002
Cost:
$12,392
$2,002 7,795 - - - - - - $2,002
7,795
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$25,132
Cost:
$52,641
$22,043 101,770 $6 1 $2,952 - $131 - $22,043
101,770
kWh
$6
1
kW-months/year
$2,952
-
$
$131
-
$
TOTAL IMPLEMENTED Savings:
$23,130
Cost:
$40,249
$20,041 93,975 $6 1 $2,952 - $131 - $20,041
93,975
kWh
$6
1
kW-months/year
$2,952
-
$
$131
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Primary Raw Material