Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

104

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0563 # 02 Y:2020 02 2020 INSULATE BARE EQUIPMENT $339 $227 Implemented
SF0563 # 03 Y:2020 03 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,582 $2,866 Implemented
SF0563 # 05 Y:2020 05 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,998 $71,975 Implemented
SF0563 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,879 $17,947 Implemented
SF0563 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,685 $200 Not Implemented
SF0562 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,675 $4,975 Not Implemented
SF0562 # 03 Y:2020 03 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,749 $13,469 Not Implemented
SF0562 # 01 Y:2020 01 2020 INSULATE BARE EQUIPMENT $1,259 $918 Implemented
SF0562 # 06 Y:2020 06 2020 RECOVER WASTE HEAT FROM EQUIPMENT $12,365 $55,965 Implemented
SF0562 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $1,641 $4,403 Not Implemented
SF0562 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,226 $2,592 Implemented
SF0562 # 07 Y:2020 07 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $26,796 $86,835 Implemented
SF0561 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,548 $4,226 Implemented
SF0561 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,203 $110 Not Implemented
SF0561 # 03 Y:2020 03 2020 INSULATE BARE EQUIPMENT $3,116 $1,412 Implemented
SF0561 # 07 Y:2020 07 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $35,550 $236,909 Implemented
SF0561 # 06 Y:2020 06 2020 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,263 $18,437 Not Implemented
SF0561 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,435 $3,959 Not Implemented
SF0561 # 01 Y:2020 01 2020 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,397 $525 Not Implemented
SF0560 # 05 Y:2020 05 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $15,645 $78,611 Implemented
SF0560 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $4,726 $14,983 Implemented
SF0560 # 02 Y:2020 02 2020 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $16,680 $26,850 Not Implemented
SF0560 # 04 Y:2020 04 2020 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $13,118 $45,851 Implemented
SF0560 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,246 $70 Not Implemented
SF0559 # 04 Y:2020 04 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $474 $1,290 Not Implemented