Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
755
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ST0064 # 08 Y:1986 | 08 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $526 | $627 | Implemented |
ST0064 # 07 Y:1986 | 07 | 1986 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,137 | $5,000 | Implemented |
ST0064 # 06 Y:1986 | 06 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $12,081 | $0 | Implemented |
ST0064 # 05 Y:1986 | 05 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,195 | $2,700 | Not Implemented |
ST0064 # 04 Y:1986 | 04 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $274 | $800 | Not Implemented |
ST0064 # 03 Y:1986 | 03 | 1986 | INSTALL AUTOMATIC STACK DAMPER | $605 | $1,034 | Not Implemented |
ST0064 # 02 Y:1986 | 02 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,331 | $537 | Not Implemented |
ST0064 # 01 Y:1986 | 01 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $1,167 | $0 | Implemented |
ST0063 # 08 Y:1986 | 08 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,371 | $4,000 | Not Implemented |
ST0063 # 07 Y:1986 | 07 | 1986 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,593 | $8,000 | Not Implemented |
ST0063 # 06 Y:1986 | 06 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $289 | $0 | Implemented |
ST0063 # 05 Y:1986 | 05 | 1986 | CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES | $11,118 | $20,000 | Not Implemented |
ST0063 # 04 Y:1986 | 04 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,600 | $783 | Not Implemented |
ST0063 # 03 Y:1986 | 03 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,096 | $537 | Implemented |
ST0063 # 02 Y:1986 | 02 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $518 | $0 | Implemented |
ST0063 # 01 Y:1986 | 01 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $347 | $102 | Implemented |
ST0062 # 07 Y:1986 | 07 | 1986 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,765 | $651 | Implemented |
ST0062 # 06 Y:1986 | 06 | 1986 | INSTALL TIMERS AND/OR THERMOSTATS | $2,605 | $1,500 | Implemented |
ST0062 # 05 Y:1986 | 05 | 1986 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $559 | $50 | Not Implemented |
ST0062 # 04 Y:1986 | 04 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $716 | $0 | Not Implemented |
ST0062 # 03 Y:1986 | 03 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,555 | $0 | Not Implemented |
ST0062 # 02 Y:1986 | 02 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,642 | $0 | Implemented |
ST0062 # 01 Y:1986 | 01 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,343 | $537 | Implemented |
ST0061 # 05 Y:1986 | 05 | 1986 | INSTALL AUTOMATIC STACK DAMPER | $757 | $1,410 | Implemented |
ST0061 # 04 Y:1986 | 04 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,593 | $421 | Not Implemented |