IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

516

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0034 # 03 Y:1985 03 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $330 $0 Implemented
ST0034 # 04 Y:1985 04 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $462 $870 Not Implemented
ST0034 # 05 Y:1985 05 1985 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $575 $1,200 Implemented
ST0034 # 06 Y:1985 06 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $150 $0 Implemented
ST0034 # 08 Y:1985 08 1985 INSTALL STORM WINDOWS AND DOORS $574 $150 Not Implemented
ST0034 # 09 Y:1985 09 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,171 $0 Not Implemented
ST0034 # 10 Y:1985 10 1985 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $333 $880 Not Implemented
ST0034 # 11 Y:1985 11 1985 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $942 $78 Not Implemented
ST0036 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,879 $20,400 Not Implemented
ST0036 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,064 $56 Implemented
ST0036 # 03 Y:1985 03 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,767 $0 Implemented
ST0036 # 04 Y:1985 04 1985 INSULATE BARE EQUIPMENT $197 $340 Implemented
ST0036 # 05 Y:1985 05 1985 INSULATE BARE EQUIPMENT $420 $200 Implemented
ST0036 # 06 Y:1985 06 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $99,880 $200,000 Not Implemented
ST0036 # 07 Y:1985 07 1985 INSULATE BARE EQUIPMENT $320 $160 Implemented
ST0036 # 08 Y:1985 08 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $792 $1,680 Implemented
ST0029 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,962 $525 Not Implemented
ST0029 # 02 Y:1985 02 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $452 $182 Not Implemented
ST0029 # 03 Y:1985 03 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $2,594 $8,405 Not Implemented
ST0029 # 04 Y:1985 04 1985 RECOVER WASTE HEAT FROM EQUIPMENT $2,045 $1,600 Not Implemented
ST0029 # 05 Y:1985 05 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $4,470 $8,786 Not Implemented
ST0029 # 06 Y:1985 06 1985 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $20,887 $49,937 Not Implemented
ST0029 # 07 Y:1985 07 1985 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,460 $0 Not Implemented
ST0029 # 08 Y:1985 08 1985 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $13,972 $1,211 Not Implemented
ST0029 # 09 Y:1985 09 1985 REPAIR AND ELIMINATE STEAM LEAKS $23,820 $160 Not Implemented