IAC logo
IAC Assessment: ST0036
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ST0036
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Stevens Institute of Technology
Assessment Year 1985
Principal Product TEFLON PRODUCTS
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 0
Annual Production 2,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $232,061 3,037,515 kWh $0.08
Natural Gas $35,391 5,803 MMBtu $6.10
TOTAL ENERGY COSTS $267,452
RECOMMENDED SAVINGS* $122,319 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,560
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,879
Cost:
$20,400
$10,879 142,438 - - $10,879
142,438
kWh
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,064
Cost:
$56
$4,064 53,341 - - $4,064
53,341
kWh
-
-
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,767
Cost:
-
$5,767 75,615 - - $5,767
75,615
kWh
-
-
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$197
Cost:
$340
$197 2,638 - - $197
2,638
kWh
-
-
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$420
Cost:
$200
$515 6,741 $(-95) (-16) $515
6,741
kWh
$(-95)
(-16)
MMBtu
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$99,880
Cost:
$200,000
$133,494 1,400,352 $(-33,614) (-5,621) $133,494
1,400,352
kWh
$(-33,614)
(-5,621)
MMBtu
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$320
Cost:
$160
$392 5,275 $(-72) (-12) $392
5,275
kWh
$(-72)
(-12)
MMBtu
08: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$792
Cost:
$1,680
$(-342) (-4,396) $1,134 190 $(-342)
(-4,396)
kWh
$1,134
190
MMBtu
TOTAL RECOMMENDED Savings:
$122,319
Cost:
$222,836
$154,966 1,682,004 $(-32,647) (-5,459) $154,966
1,682,004
kWh
$(-32,647)
(-5,459)
MMBtu
TOTAL IMPLEMENTED Savings:
$11,560
Cost:
$2,436
$10,593 139,214 $967 162 $10,593
139,214
kWh
$967
162
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas