Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
89
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0209 # 05 Y:2005 | 05 | 2005 | INSTALL TURBULATORS | $1,988 | $500 | Not Implemented |
SU0209 # 06 Y:2005 | 06 | 2005 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $30,000 | $16,000 | Implemented |
SU0209 # 07 Y:2005 | 07 | 2005 | USE SYNTHETIC LUBRICANT | $1,072 | $1,000 | Implemented |
SU0209 # 08 Y:2005 | 08 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,558 | $8,908 | Not Implemented |
SU0202 # 07 Y:2005 | 07 | 2005 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $87,899 | $535,000 | Not Implemented |
SU0202 # 06 Y:2005 | 06 | 2005 | OPTIMIZE PLANT POWER FACTOR | $5,577 | $30,560 | Implemented |
SU0202 # 05 Y:2005 | 05 | 2005 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $482 | $1,330 | Not Implemented |
SU0202 # 04 Y:2005 | 04 | 2005 | USE SYNTHETIC LUBRICANT | $1,315 | $2,000 | Not Implemented |
SU0202 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,644 | $500 | Implemented |
SU0202 # 02 Y:2005 | 02 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,691 | $150 | Implemented |
SU0202 # 01 Y:2005 | 01 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,315 | $0 | Implemented |
SU0192 # 01 Y:2004 | 01 | 2004 | $65,154 | $9,000 | Implemented | |
SU0192 # 02 Y:2004 | 02 | 2004 | INSTALL OCCUPANCY SENSORS | $3,355 | $1,049 | Not Implemented |
SU0192 # 03 Y:2004 | 03 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,106 | $491 | Implemented |
SU0192 # 05 Y:2004 | 05 | 2004 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $51,637 | $45,000 | Implemented |
SU0192 # 06 Y:2004 | 06 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $232 | $250 | Implemented |
SU0192 # 04 Y:2004 | 04 | 2004 | $217,181 | $187,500 | Implemented | |
SU0187 # 06 Y:2004 | 06 | 2004 | INSTALL OCCUPANCY SENSORS | $1,206 | $3,817 | Not Implemented |
SU0187 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,721 | $10,129 | Implemented |
SU0187 # 04 Y:2004 | 04 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $26,177 | $53,000 | Not Implemented |
SU0187 # 03 Y:2004 | 03 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $513 | $442 | Not Implemented |
SU0187 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,502 | $350 | Implemented |
SU0187 # 01 Y:2004 | 01 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,725 | $0 | Not Implemented |
SU0182 # 03 Y:2004 | 03 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,773 | $381 | Implemented |
SU0182 # 01 Y:2004 | 01 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $26,427 | $0 | Not Implemented |