Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,644
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0167 # 01 Y:1983 | 01 | 1983 | REDUCE VENTILATION AIR | $23,801 | $11,000 | Not Implemented |
TN0167 # 02 Y:1983 | 02 | 1983 | BURN WOOD BY-PRODUCTS FOR HEAT | $250,513 | $1,000,000 | Not Implemented |
TN0167 # 03 Y:1983 | 03 | 1983 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $30,929 | $32,300 | Not Implemented |
TN0167 # 04 Y:1983 | 04 | 1983 | REDUCE VENTILATION AIR | $5,074 | $18,612 | Not Implemented |
TN0156 # 01 Y:1982 | 01 | 1982 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $440 | $0 | Not Implemented |
TN0156 # 02 Y:1982 | 02 | 1982 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $246 | $0 | Not Implemented |
TN0156 # 03 Y:1982 | 03 | 1982 | INSULATE BARE EQUIPMENT | $9,900 | $10,000 | Not Implemented |
TN0156 # 04 Y:1982 | 04 | 1982 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $17,550 | $50,000 | Not Implemented |
TN0162 # 01 Y:1982 | 01 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $467 | $600 | Not Implemented |
TN0162 # 02 Y:1982 | 02 | 1982 | INSTALL AUTOMATIC STACK DAMPER | $623 | $1,260 | Not Implemented |
TN0162 # 03 Y:1982 | 03 | 1982 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,327 | $17,020 | Not Implemented |
TN0162 # 04 Y:1982 | 04 | 1982 | INSTALL SET-BACK TIMERS | $378 | $0 | Not Implemented |
TN0163 # 01 Y:1982 | 01 | 1982 | COVER OPEN TANKS | $5,700 | $1,250 | Not Implemented |
TN0163 # 02 Y:1982 | 02 | 1982 | INSULATE BARE EQUIPMENT | $140 | $100 | Not Implemented |
TN0163 # 03 Y:1982 | 03 | 1982 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $500 | $0 | Implemented |
TN0165 # 01 Y:1982 | 01 | 1982 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $16,096 | $6,350 | Not Implemented |
TN0165 # 02 Y:1982 | 02 | 1982 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $4,780 | $9,000 | Not Implemented |
TN0165 # 03 Y:1982 | 03 | 1982 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,132 | $200 | Implemented |
TN0165 # 04 Y:1982 | 04 | 1982 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,920 | $500 | Implemented |
TN0146 # 01 Y:1982 | 01 | 1982 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $32,767 | $35,000 | Not Implemented |
TN0146 # 02 Y:1982 | 02 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $19,172 | $2,000 | Not Implemented |
TN0146 # 03 Y:1982 | 03 | 1982 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $9,986 | $15,000 | Not Implemented |
TN0146 # 04 Y:1982 | 04 | 1982 | REPAIR AND ELIMINATE STEAM LEAKS | $1,549 | $100 | Not Implemented |
TN0146 # 05 Y:1982 | 05 | 1982 | INSULATE BARE EQUIPMENT | $2,130 | $5,000 | Not Implemented |
TN0146 # 06 Y:1982 | 06 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,392 | $15,000 | Not Implemented |