Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0645 # 01 Y:1998 | 01 | 1998 | ALLOW DRAINAGE BEFORE WITHDRAWING OBJECT | $408,630 | $24,685 | Implemented |
TN0645 # 13 Y:1998 | 13 | 1998 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $2,780 | $14,300 | Not Implemented |
TN0645 # 12 Y:1998 | 12 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,310 | $1,120 | Not Implemented |
TN0645 # 11 Y:1998 | 11 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,880 | $5,000 | Implemented |
TN0645 # 10 Y:1998 | 10 | 1998 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $9,390 | $8,000 | Implemented |
TN0645 # 09 Y:1998 | 09 | 1998 | INSTALL SET-BACK TIMERS | $15,755 | $1,555 | Not Implemented |
TN0645 # 08 Y:1998 | 08 | 1998 | TREAT AND REUSE RINSE WATERS | $28,105 | $69,200 | Not Implemented |
TN0645 # 07 Y:1998 | 07 | 1998 | USE DEIONIZED WATER IN UPSTREAM RINSE TANKS | $48,650 | $120,000 | Not Implemented |
TN0645 # 06 Y:1998 | 06 | 1998 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $51,945 | $200,000 | Not Implemented |
TN0645 # 05 Y:1998 | 05 | 1998 | $198,225 | $250,000 | Not Implemented | |
TN0645 # 04 Y:1998 | 04 | 1998 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $221,455 | $70,000 | Not Implemented |
TN0645 # 03 Y:1998 | 03 | 1998 | REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS | $237,600 | $153,485 | Not Implemented |
TN0645 # 02 Y:1998 | 02 | 1998 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $277,345 | $644,800 | Not Implemented |
TN0636 # 06 Y:1998 | 06 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $150 | $600 | Implemented |
TN0636 # 05 Y:1998 | 05 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $175 | $0 | Implemented |
TN0636 # 04 Y:1998 | 04 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $490 | $980 | Not Implemented |
TN0636 # 03 Y:1998 | 03 | 1998 | INSULATE BARE EQUIPMENT | $670 | $220 | Implemented |
TN0636 # 02 Y:1998 | 02 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,455 | $0 | Not Implemented |
TN0636 # 01 Y:1998 | 01 | 1998 | $46,480 | $37,380 | Not Implemented | |
TN0625 # 01 Y:1998 | 01 | 1998 | $65,150 | $545,645 | Not Implemented | |
TN0625 # 07 Y:1998 | 07 | 1998 | INSTALL TIMERS AND/OR THERMOSTATS | $210 | $465 | Not Implemented |
TN0625 # 06 Y:1998 | 06 | 1998 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $900 | $0 | Implemented |
TN0625 # 05 Y:1998 | 05 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,380 | $6,370 | Implemented |
TN0625 # 04 Y:1998 | 04 | 1998 | SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED | $9,965 | $5,000 | Implemented |
TN0625 # 03 Y:1998 | 03 | 1998 | IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) | $60,120 | $116,240 | Implemented |