IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

215

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0165 # 04 Y:1982 04 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,920 $500 Implemented
TN0156 # 01 Y:1982 01 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $440 $0 Not Implemented
TN0156 # 02 Y:1982 02 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $246 $0 Not Implemented
TN0156 # 03 Y:1982 03 1982 INSULATE BARE EQUIPMENT $9,900 $10,000 Not Implemented
TN0156 # 04 Y:1982 04 1982 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $17,550 $50,000 Not Implemented
TN0162 # 01 Y:1982 01 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $467 $600 Not Implemented
TN0162 # 02 Y:1982 02 1982 INSTALL AUTOMATIC STACK DAMPER $623 $1,260 Not Implemented
TN0162 # 03 Y:1982 03 1982 RECOVER WASTE HEAT FROM EQUIPMENT $7,327 $17,020 Not Implemented
TN0163 # 01 Y:1982 01 1982 COVER OPEN TANKS $5,700 $1,250 Not Implemented
TN0165 # 03 Y:1982 03 1982 INSTALL / REPAIR INSULATION ON STEAM LINES $2,132 $200 Implemented
TN0165 # 02 Y:1982 02 1982 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $4,780 $9,000 Not Implemented
TN0165 # 01 Y:1982 01 1982 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $16,096 $6,350 Not Implemented
TN0162 # 04 Y:1982 04 1982 INSTALL SET-BACK TIMERS $378 $0 Not Implemented
TN0163 # 03 Y:1982 03 1982 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $500 $0 Implemented
TN0163 # 02 Y:1982 02 1982 INSULATE BARE EQUIPMENT $140 $100 Not Implemented
TN0154 # 03 Y:1982 03 1982 INSTALL SET-BACK TIMERS $642 $2,100 Not Implemented
TN0146 # 01 Y:1982 01 1982 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $32,767 $35,000 Not Implemented
TN0146 # 06 Y:1982 06 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,392 $15,000 Not Implemented
TN0146 # 05 Y:1982 05 1982 INSULATE BARE EQUIPMENT $2,130 $5,000 Not Implemented
TN0154 # 04 Y:1982 04 1982 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $264 $0 Not Implemented
TN0146 # 04 Y:1982 04 1982 REPAIR AND ELIMINATE STEAM LEAKS $1,549 $100 Not Implemented
TN0161 # 03 Y:1982 03 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $774 $0 Not Implemented
TN0146 # 03 Y:1982 03 1982 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $9,986 $15,000 Not Implemented
TN0146 # 02 Y:1982 02 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $19,172 $2,000 Not Implemented
TN0154 # 01 Y:1982 01 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $844 $25 Not Implemented