Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
217
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0586 # 06 Y:1996 | 06 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,800 | $7,350 | Not Implemented |
TN0586 # 02 Y:1996 | 02 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $39,080 | $7,880 | Implemented |
TN0596 # 01 Y:1996 | 01 | 1996 | REDESIGN PROCESS | $97,310 | $38,900 | Not Implemented |
TN0596 # 05 Y:1996 | 05 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,870 | $4,200 | Implemented |
TN0596 # 06 Y:1996 | 06 | 1996 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,170 | $7,000 | Implemented |
TN0596 # 07 Y:1996 | 07 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $580 | $410 | Implemented |
TN0586 # 04 Y:1996 | 04 | 1996 | TREAT AND REUSE RINSE WATERS | $29,935 | $66,740 | Not Implemented |
TN0586 # 05 Y:1996 | 05 | 1996 | OPTIMIZE PLANT POWER FACTOR | $25,125 | $60,800 | Not Implemented |
TN0596 # 03 Y:1996 | 03 | 1996 | RECOVER WASTE HEAT FROM EQUIPMENT | $40,800 | $99,260 | Not Implemented |
TN0586 # 09 Y:1996 | 09 | 1996 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $4,410 | $0 | Implemented |
TN0586 # 08 Y:1996 | 08 | 1996 | INSULATE BARE EQUIPMENT | $3,650 | $4,400 | Not Implemented |
TN0596 # 04 Y:1996 | 04 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $37,300 | $61,100 | Not Implemented |
TN0586 # 01 Y:1996 | 01 | 1996 | REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS | $50,410 | $15,300 | Not Implemented |
TN0586 # 03 Y:1996 | 03 | 1996 | USE EVAPORATION TO CONCENTRATE MATERIAL | $32,200 | $30,600 | Not Implemented |
TN0586 # 07 Y:1996 | 07 | 1996 | UPGRADE CONTROLS ON COMPRESSORS | $7,400 | $29,600 | Not Implemented |
TN0586 # 10 Y:1996 | 10 | 1996 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $340 | $260 | Not Implemented |
TN0596 # 02 Y:1996 | 02 | 1996 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $80,150 | $1,130 | Implemented |
TN0595 # 02 Y:1996 | 02 | 1996 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $33,550 | $15,600 | Not Implemented |
TN0595 # 05 Y:1996 | 05 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,660 | $480 | Not Implemented |
TN0595 # 08 Y:1996 | 08 | 1996 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $1,600 | $930 | Not Implemented |
TN0595 # 04 Y:1996 | 04 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,230 | $7,525 | Implemented |
TN0595 # 03 Y:1996 | 03 | 1996 | INSULATE BARE EQUIPMENT | $9,770 | $5,400 | Implemented |
TN0595 # 01 Y:1996 | 01 | 1996 | INSTALL TIMERS AND/OR THERMOSTATS | $34,060 | $12,880 | Implemented |
TN0595 # 07 Y:1996 | 07 | 1996 | IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) | $2,600 | $0 | Implemented |
TN0595 # 06 Y:1996 | 06 | 1996 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,920 | $4,450 | Not Implemented |