Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
119
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TS0033 # 03 Y:1986 | 03 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,996 | $178 | Not Implemented |
TS0033 # 04 Y:1986 | 04 | 1986 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,601 | $0 | Not Implemented |
TS0033 # 02 Y:1986 | 02 | 1986 | USE OPTIMUM THICKNESS INSULATION | $1,345 | $2,730 | Not Implemented |
TS0033 # 06 Y:1986 | 06 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $922 | $1,300 | Not Implemented |
TS0033 # 01 Y:1986 | 01 | 1986 | INSULATE BARE EQUIPMENT | $13,881 | $2,730 | Not Implemented |
TS0033 # 05 Y:1986 | 05 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,451 | $1,000 | Not Implemented |
TS0032 # 03 Y:1986 | 03 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $635 | $178 | Not Implemented |
TS0032 # 02 Y:1986 | 02 | 1986 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $8,661 | $4,000 | Not Implemented |
TS0032 # 04 Y:1986 | 04 | 1986 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,690 | $0 | Not Implemented |
TS0032 # 01 Y:1986 | 01 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,844 | $1,500 | Not Implemented |
TS0031 # 03 Y:1985 | 03 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,147 | $50 | Not Implemented |
TS0031 # 01 Y:1985 | 01 | 1985 | OPTIMIZE PLANT POWER FACTOR | $18,150 | $13,550 | Not Implemented |
TS0031 # 02 Y:1985 | 02 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,504 | $3,500 | Not Implemented |
TS0031 # 06 Y:1985 | 06 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,081 | $500 | Not Implemented |
TS0031 # 04 Y:1985 | 04 | 1985 | REDUCE GLAZED AREAS IN BUILDINGS | $1,681 | $1,360 | Not Implemented |
TS0031 # 05 Y:1985 | 05 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,076 | $280 | Not Implemented |
TS0028 # 03 Y:1985 | 03 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $811 | $300 | Not Implemented |
TS0029 # 01 Y:1985 | 01 | 1985 | OPTIMIZE PLANT POWER FACTOR | $65,767 | $60,000 | Not Implemented |
TS0028 # 01 Y:1985 | 01 | 1985 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,831 | $0 | Not Implemented |
TS0028 # 02 Y:1985 | 02 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,428 | $0 | Not Implemented |
TS0029 # 02 Y:1985 | 02 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,874 | $100 | Not Implemented |
TS0029 # 03 Y:1985 | 03 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,514 | $2,892 | Not Implemented |
TS0026 # 02 Y:1985 | 02 | 1985 | INSULATE BARE EQUIPMENT | $325 | $460 | Not Implemented |
TS0026 # 01 Y:1985 | 01 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $9,637 | $3,240 | Not Implemented |
TS0027 # 03 Y:1985 | 03 | 1985 | INSTALL STORM WINDOWS AND DOORS | $916 | $1,275 | Not Implemented |