IAC Assessment: TS0027
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TS0027
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tri-Cities University
Assessment Year 1985
Principal Product BOAT WINDSHIELDS
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 90
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 2,080
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $15,798 228,019 kWh $0.07
Natural Gas $21,022 3,786 MMBtu $5.55
TOTAL ENERGY COSTS $36,820
RECOMMENDED SAVINGS* $6,802 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,195
Cost:
$216
$1,195 16,999 - - $1,195
16,999
kWh
-
-
MMBtu
02: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$2,348
Cost:
$3,929
- - $2,348 423 -
-
kWh
$2,348
423
MMBtu
03: 2.7494 INSTALL STORM WINDOWS AND DOORS Savings:
$916
Cost:
$1,275
- - $916 165 -
-
kWh
$916
165
MMBtu
04: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE Savings:
$555
Cost:
$500
- - $555 100 -
-
kWh
$555
100
MMBtu
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,684
Cost:
-
$1,684 - - - $1,684
-
kWh
-
-
MMBtu
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$104
Cost:
-
$104 1,758 - - $104
1,758
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$6,802
Cost:
$5,920
$2,983 18,757 $3,819 688 $2,983
18,757
kWh
$3,819
688
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas