Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,217
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0310 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $6,590 | $2,200 | n/a |
TT0310 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $25,939 | $3,600 | n/a |
TT0310 # 07 Y:2024 | 07 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $335 | $75 | n/a |
TT0310 # 02 Y:2024 | 02 | 2024 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $10,414 | $17,000 | n/a |
TT0310 # 04 Y:2024 | 04 | 2024 | OPTIMIZE PLANT POWER FACTOR | $7,227 | $9,500 | n/a |
TT0310 # 03 Y:2024 | 03 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,068 | $12,500 | n/a |
TT0310 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,799 | $60 | n/a |
TT0312 # 09 Y:2024 | 09 | 2024 | INSTALL OCCUPANCY SENSORS | $1,294 | $1,860 | n/a |
TT0312 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,740 | $11,250 | n/a |
TT0312 # 06 Y:2024 | 06 | 2024 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $14,000 | $12,000 | n/a |
TT0312 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,292 | $635 | n/a |
TT0312 # 10 Y:2024 | 10 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,155 | $4,810 | n/a |
TT0312 # 03 Y:2024 | 03 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $30,815 | $6,360 | n/a |
TT0312 # 04 Y:2024 | 04 | 2024 | INSULATE BARE EQUIPMENT | $9,940 | $2,262 | n/a |
TT0312 # 01 Y:2024 | 01 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $36,945 | $0 | n/a |
TT0312 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,728 | $30 | n/a |
TT0312 # 08 Y:2024 | 08 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,253 | $3,000 | n/a |
TT0315 # 08 Y:2024 | 08 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,159 | $1,700 | n/a |
TT0315 # 02 Y:2024 | 02 | 2024 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $13,017 | $16,000 | n/a |
TT0315 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,389 | $2,000 | n/a |
TT0315 # 04 Y:2024 | 04 | 2024 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $10,616 | $66,000 | n/a |
TT0315 # 07 Y:2024 | 07 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,015 | $15,600 | n/a |
TT0315 # 09 Y:2024 | 09 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $204 | $184 | n/a |
TT0315 # 01 Y:2024 | 01 | 2024 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $44,634 | $22,300 | n/a |
TT0315 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,328 | $1,500 | n/a |