IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

74

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0296 # 11 Y:2023 11 2023 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $2,853 $7,500 n/a
TT0296 # 07 Y:2023 07 2023 OPTIMIZE PLANT POWER FACTOR $41,037 $32,500 n/a
TT0296 # 08 Y:2023 08 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,078 $4,500 n/a
TT0296 # 04 Y:2023 04 2023 UPGRADE CONTROLS ON COMPRESSORS $22,207 $1,640 n/a
TT0296 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,069 $270 n/a
TT0296 # 02 Y:2023 02 2023 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $66,640 $2,000 n/a
TT0296 # 10 Y:2023 10 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $203,680 $300,000 n/a
TT0296 # 09 Y:2023 09 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,690 $8,100 n/a
TT0296 # 06 Y:2023 06 2023 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $81,000 $60,000 n/a
TT0296 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,264 $1,920 n/a
TT0296 # 03 Y:2023 03 2023 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $200,000 $10,000 n/a
TT0265 # 01 Y:2022 01 2022 INSULATE BARE EQUIPMENT $12,477 $2,065 Not Implemented
TT0265 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,704 $9,000 Not Implemented
TT0265 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,587 $3,967 Implemented
TT0176 # 03 Y:2016 03 2016 DISCONNECT BALLASTS $9,857 $1,000 Implemented
TT0176 # 01 Y:2016 01 2016 UPGRADE CONTROLS ON COMPRESSORS $89,975 $250 Implemented
TT0176 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,541 $46,932 Implemented
TT0086 # 03 Y:2012 03 2012 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $3,238 $7,500 Not Implemented
TT0086 # 02 Y:2012 02 2012 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,061 $0 Implemented
TT0086 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,266 $3,000 Implemented
TT0086 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,497 $9,219 Implemented
TT0086 # 01 Y:2012 01 2012 USE OPTIMUM THICKNESS INSULATION $920 $950 Implemented
TT0084 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,912 $3,000 Not Implemented
TT0084 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,391 $15,000 Not Implemented
TT0084 # 03 Y:2012 03 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,245 $3,500 Not Implemented