Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
210
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0339 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,876 | $5,625 | n/a |
TT0339 # 02 Y:2025 | 02 | 2025 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $33,333 | $35,000 | n/a |
TT0339 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT FOR HEAT | $49,796 | $276,634 | n/a |
TT0339 # 08 Y:2025 | 08 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,566 | $850 | n/a |
TT0339 # 05 Y:2025 | 05 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $22,030 | $20,000 | n/a |
TT0339 # 09 Y:2025 | 09 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $868 | $100 | n/a |
TT0339 # 03 Y:2025 | 03 | 2025 | OPTIMIZE PLANT POWER FACTOR | $31,076 | $9,750 | n/a |
TT0339 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,795 | $10,920 | n/a |
TT0339 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,575 | $11,250 | n/a |
TT0337 # 04 Y:2025 | 04 | 2025 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $210 | $500 | n/a |
TT0337 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,154 | $1,570 | n/a |
TT0337 # 06 Y:2025 | 06 | 2025 | IMPROVE COMBUSTION CONTROL CAPABILITY | $2,372 | $1,000 | n/a |
TT0337 # 07 Y:2025 | 07 | 2025 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,382 | $16,500 | n/a |
TT0337 # 02 Y:2025 | 02 | 2025 | CONVERT TO OXYFUEL BURNERS | $37,798 | $25,000 | n/a |
TT0337 # 08 Y:2025 | 08 | 2025 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $108,000 | $12,300 | n/a |
TT0337 # 09 Y:2025 | 09 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,714 | $5,000 | n/a |
TT0337 # 01 Y:2025 | 01 | 2025 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $1,309 | $1,884 | n/a |
TT0337 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,274 | $12,000 | n/a |
TT0336 # 03 Y:2025 | 03 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $13,640 | $6,680 | n/a |
TT0336 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $19,703 | $159,000 | n/a |
TT0336 # 04 Y:2025 | 04 | 2025 | BURN A LESS EXPENSIVE GRADE OF FUEL | $6,724 | $40,000 | n/a |
TT0336 # 06 Y:2025 | 06 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,830 | $500 | n/a |
TT0336 # 10 Y:2025 | 10 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $507 | $100 | n/a |
TT0336 # 07 Y:2025 | 07 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,078 | $400 | n/a |
TT0336 # 08 Y:2025 | 08 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $572 | $60 | n/a |