Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,987
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0291 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $107 | $452 | n/a |
UA0291 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $688 | $3,738 | n/a |
UA0291 # 04 Y:2024 | 04 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $531 | $1,463 | n/a |
UA0291 # 03 Y:2024 | 03 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $178,998 | $1,000,734 | n/a |
UA0291 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,693 | $8,473 | n/a |
UA0291 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,753 | $500 | n/a |
UA0290 # 08 Y:2024 | 08 | 2024 | INSTALL OCCUPANCY SENSORS | $348 | $452 | n/a |
UA0290 # 07 Y:2024 | 07 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $224 | $224 | n/a |
UA0290 # 06 Y:2024 | 06 | 2024 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $10,563 | $56,271 | n/a |
UA0290 # 05 Y:2024 | 05 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,137 | $2,005 | n/a |
UA0290 # 04 Y:2024 | 04 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,760 | $8,397 | n/a |
UA0290 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,530 | $5,091 | n/a |
UA0290 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,200 | $500 | n/a |
UA0290 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $81,410 | $555,652 | n/a |
UA0289 # 10 Y:2024 | 10 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $1,219 | $79 | n/a |
UA0289 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $330,998 | $8,608,788 | n/a |
UA0289 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $6,141 | $6,733 | n/a |
UA0289 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $19,427 | $1,000 | n/a |
UA0289 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $26,555 | $8,591 | n/a |
UA0289 # 05 Y:2024 | 05 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,789 | $22,563 | n/a |
UA0289 # 07 Y:2024 | 07 | 2024 | INSTALL OCCUPANCY SENSORS | $4,334 | $6,800 | n/a |
UA0289 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,369 | $17,266 | n/a |
UA0289 # 09 Y:2024 | 09 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $48,585 | $5,495 | n/a |
UA0289 # 08 Y:2024 | 08 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $218,857 | $1,056,464 | n/a |
UA0288 # 06 Y:2024 | 06 | 2024 | OPTIMIZE PLANT POWER FACTOR | $8,607 | $5,049 | n/a |