IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,828

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0034 # 03 Y:1982 03 1982 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $252 $100 Not Implemented
UD0034 # 04 Y:1982 04 1982 REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS $46,072 $120,000 Not Implemented
UD0034 # 05 Y:1982 05 1982 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $761 $400 Not Implemented
UD0035 # 01 Y:1982 01 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $70 $150 Implemented
UD0035 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $938 $258 Implemented
UD0035 # 03 Y:1982 03 1982 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $4,933 $2,000 Not Implemented
UD0035 # 04 Y:1982 04 1982 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,768 $1,700 Implemented
UD0035 # 05 Y:1982 05 1982 REDUCE VENTILATION AIR $180 $150 Not Implemented
UD0036 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,160 $3,500 Not Implemented
UD0036 # 02 Y:1982 02 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,000 $20,000 Not Implemented
UD0036 # 03 Y:1982 03 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,018 $112 Not Implemented
UD0036 # 04 Y:1982 04 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,120 $5,535 Implemented
UD0036 # 05 Y:1982 05 1982 RECOVER WASTE HEAT FROM EQUIPMENT $1,834 $6,650 Not Implemented
UD0036 # 06 Y:1982 06 1982 REDUCE VENTILATION AIR $3,333 $5 Not Implemented
UD0036 # 07 Y:1982 07 1982 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,551 $5,000 Not Implemented
UD0032 # 01 Y:1982 01 1982 KEEP LAMPS AND REFLECTORS CLEAN $223 $5 Implemented
UD0032 # 02 Y:1982 02 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $617 $3,206 Implemented
UD0032 # 03 Y:1982 03 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $349 $1,141 Implemented
UD0032 # 04 Y:1982 04 1982 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,816 $21,800 Implemented
UD0032 # 05 Y:1982 05 1982 INSTALL STORM WINDOWS AND DOORS $2,478 $6,000 Implemented
UD0033 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,288 $386 Implemented
UD0033 # 02 Y:1982 02 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,030 $3,140 Implemented
UD0033 # 03 Y:1982 03 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $84 $0 Implemented
UD0033 # 04 Y:1982 04 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $872 $250 Implemented
UD0030 # 01 Y:1982 01 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,014 $0 Implemented