Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0381 # 10 Y:2006 | 10 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,495 | $8,880 | Implemented |
UF0381 # 09 Y:2006 | 09 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,919 | $0 | Implemented |
UF0381 # 08 Y:2006 | 08 | 2006 | ELIMINATE A BY-PRODUCT | $278 | $32 | Implemented |
UF0381 # 07 Y:2006 | 07 | 2006 | UPGRADE OBSOLETE EQUIPMENT | $21,240 | $43,000 | Implemented |
UF0381 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,966 | $334 | Implemented |
UF0381 # 02 Y:2006 | 02 | 2006 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $4,916 | $715 | Implemented |
UF0379 # 06 Y:2006 | 06 | 2006 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $18,041 | $44,500 | Implemented |
UF0379 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $40,792 | $517 | Implemented |
UF0379 # 04 Y:2006 | 04 | 2006 | ISOLATE HOT OR COLD EQUIPMENT | $8,414 | $1,095 | Implemented |
UF0379 # 01 Y:2006 | 01 | 2006 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $519 | $0 | Implemented |
UF0353 # 05 Y:2004 | 05 | 2004 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $17,635 | $0 | Implemented |
UF0353 # 06 Y:2004 | 06 | 2004 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,048 | $8,000 | Implemented |
UF0353 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,132 | $2,140 | Implemented |
UF0353 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,503 | $546 | Implemented |
UF0353 # 01 Y:2004 | 01 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,666 | $2,499 | Implemented |
UF0348 # 01 Y:2004 | 01 | 2004 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $1,333,121 | $2,700,000 | Implemented |
UF0348 # 10 Y:2004 | 10 | 2004 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $3,760 | $0 | Implemented |
UF0348 # 09 Y:2004 | 09 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,977 | $456 | Implemented |
UF0348 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,203 | $6,441 | Implemented |
UF0348 # 06 Y:2004 | 06 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $39,206 | $74,000 | Implemented |
UF0348 # 04 Y:2004 | 04 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,169 | $10,500 | Implemented |
UF0348 # 03 Y:2004 | 03 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,249 | $0 | Implemented |
UF0348 # 02 Y:2004 | 02 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,420 | $29,400 | Implemented |