Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,130
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK2107 # 06 Y:2021 | 06 | 2021 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,085 | $797 | n/a |
UK2107 # 02 Y:2021 | 02 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,788 | $0 | n/a |
UK2107 # 05 Y:2021 | 05 | 2021 | INSULATE BARE EQUIPMENT | $2,733 | $2,931 | n/a |
UK2107 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,932 | $3,950 | n/a |
UK2107 # 03 Y:2021 | 03 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $662 | $150 | n/a |
UK2107 # 04 Y:2021 | 04 | 2021 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $2,257 | $1,770 | n/a |
UK2106 # 09 Y:2021 | 09 | 2021 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $49,643 | $75,000 | n/a |
UK2106 # 05 Y:2021 | 05 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $330 | $80 | n/a |
UK2106 # 06 Y:2021 | 06 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $267 | $100 | n/a |
UK2106 # 03 Y:2021 | 03 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $685 | $1,660 | n/a |
UK2106 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,035 | $2,510 | n/a |
UK2106 # 07 Y:2021 | 07 | 2021 | INSTALL OCCUPANCY SENSORS | $1,142 | $640 | n/a |
UK2106 # 11 Y:2021 | 11 | 2021 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $10,154 | $600 | n/a |
UK2106 # 01 Y:2021 | 01 | 2021 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,854 | $1,665 | n/a |
UK2106 # 08 Y:2021 | 08 | 2021 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $731,255 | $3,500,000 | n/a |
UK2106 # 02 Y:2021 | 02 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,964 | $0 | n/a |
UK2106 # 10 Y:2021 | 10 | 2021 | INSULATE BARE EQUIPMENT | $1,250 | $881 | n/a |
UK2105 # 02 Y:2021 | 02 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,578 | $0 | n/a |
UK2105 # 05 Y:2021 | 05 | 2021 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $185 | $332 | n/a |
UK2105 # 07 Y:2021 | 07 | 2021 | INSTALL OCCUPANCY SENSORS | $1,473 | $3,200 | n/a |
UK2105 # 10 Y:2021 | 10 | 2021 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,248 | $1,000 | n/a |
UK2105 # 09 Y:2021 | 09 | 2021 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,619 | $644 | n/a |
UK2105 # 11 Y:2021 | 11 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,807 | $400 | n/a |
UK2105 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,309 | $2,702 | n/a |
UK2105 # 04 Y:2021 | 04 | 2021 | INSULATE BARE EQUIPMENT | $1,049 | $994 | n/a |