IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,094

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0377 # 04 Y:2010 04 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $71 $10 Not Implemented
UM0377 # 05 Y:2010 05 2010 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $47,701 $4,568 Not Implemented
UM0377 # 06 Y:2010 06 2010 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $11,037 $8,500 Not Implemented
UM0377 # 07 Y:2010 07 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,767 $700 Not Implemented
UM0377 # 08 Y:2010 08 2010 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,554 $11,607 Not Implemented
UM0377 # 09 Y:2010 09 2010 REPROCESS SPENT OILS ON SITE FOR RE-USE $626 $627 Not Implemented
UM0376 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,368 $36,732 Implemented
UM0376 # 02 Y:2010 02 2010 INSTALL OCCUPANCY SENSORS $7,625 $250 Implemented
UM0376 # 03 Y:2010 03 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,381 $9,416 Implemented
UM0376 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,012 $6,547 Implemented
UM0376 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,793 $200 Implemented
UM0376 # 06 Y:2010 06 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,126 $2,000 Implemented
UM0376 # 07 Y:2010 07 2010 OPTIMIZE PLANT POWER FACTOR $2,850 $2,850 Implemented
UM0376 # 08 Y:2010 08 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $248 $10 Implemented
UM0376 # 09 Y:2010 09 2010 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,943 $2,800 Implemented
UM0376 # 10 Y:2010 10 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $582 $6,500 Implemented
UM0376 # 11 Y:2010 11 2010 HEAT WATER WITH EXHAUST HEAT $35,366 $24,762 Not Implemented
UM0375 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $126,231 $236,764 Implemented
UM0375 # 02 Y:2010 02 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $16,709 $4,000 Implemented
UM0375 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $7,646 $4,232 Implemented
UM0375 # 04 Y:2010 04 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $27,796 $140,490 Implemented
UM0375 # 05 Y:2010 05 2010 RECOVER WASTE HEAT FROM EQUIPMENT $16,802 $5,500 Implemented
UM0374 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,667 $200 Not Implemented
UM0374 # 02 Y:2010 02 2010 INSTALL OCCUPANCY SENSORS $1,765 $2,250 Not Implemented
UM0374 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,227 $6,400 Not Implemented