IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,094

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0322 # 07 Y:2007 07 2007 REDUCE FLUID FLOW RATES $1,434 $2,200 Not Implemented
UM0322 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $913 $600 Implemented
UM0322 # 09 Y:2007 09 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $560 $1,815 Not Implemented
UM0322 # 10 Y:2007 10 2007 USE PHOTOCELL CONTROLS $549 $190 Implemented
UM0321 # 01 Y:2007 01 2007 USE HEAT PUMP FOR SPACE CONDITIONING $33,455 $21,730 Not Implemented
UM0321 # 02 Y:2007 02 2007 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $11,520 $21,700 Not Implemented
UM0321 # 03 Y:2007 03 2007 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $9,993 $1,000 Implemented
UM0321 # 04 Y:2007 04 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,307 $1,000 Implemented
UM0321 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,338 $0 Implemented
UM0321 # 06 Y:2007 06 2007 TREAT AND REUSE RINSE WATERS $3,084 $8,021 Not Implemented
UM0321 # 07 Y:2007 07 2007 INSTALL OCCUPANCY SENSORS $1,558 $5,130 Implemented
UM0320 # 01 Y:2007 01 2007 REDUCE VENTILATION AIR $20,841 $4,960 Not Implemented
UM0320 # 02 Y:2007 02 2007 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $19,072 $0 Implemented
UM0320 # 03 Y:2007 03 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,725 $3,000 Not Implemented
UM0320 # 04 Y:2007 04 2007 REVISE SMOKE CLEANUP FROM OPERATIONS $11,829 $1,846 Implemented
UM0320 # 05 Y:2007 05 2007 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $10,797 $0 Implemented
UM0320 # 06 Y:2007 06 2007 OPTIMIZE PLANT POWER FACTOR $10,572 $19,721 Implemented
UM0320 # 07 Y:2007 07 2007 RECOVER WASTE HEAT FROM EQUIPMENT $7,938 $500 Implemented
UM0320 # 08 Y:2007 08 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,982 $825 Implemented
UM0320 # 09 Y:2007 09 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,603 $20 Implemented
UM0320 # 10 Y:2007 10 2007 UPGRADE CONTROLS ON COMPRESSORS $4,703 $1 Implemented
UM0320 # 11 Y:2007 11 2007 DISCONNECT BALLASTS $3,782 $0 Implemented
UM0320 # 12 Y:2007 12 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,510 $80 Implemented
UM0320 # 13 Y:2007 13 2007 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $900 $100 Implemented
UM0319 # 01 Y:2007 01 2007 RECOVER AND REUSE COOLING WATER $56,454 $0 Not Implemented