Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,723
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0266 # 07 Y:2025 | 07 | 2025 | OPTIMIZE PLANT POWER FACTOR | $8,550 | $22,000 | n/a |
UU0266 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $633 | $543 | n/a |
UU0266 # 05 Y:2025 | 05 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,730 | $6,960 | n/a |
UU0266 # 04 Y:2025 | 04 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $15,500 | $38,200 | n/a |
UU0266 # 03 Y:2025 | 03 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $52,801 | $18,500 | n/a |
UU0266 # 02 Y:2025 | 02 | 2025 | USE RADIANT HEATER FOR SPOT HEATING | $8,217 | $13,000 | n/a |
UU0266 # 01 Y:2025 | 01 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $15,681 | $22,500 | n/a |
UU0265 # 08 Y:2025 | 08 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $545 | $572 | n/a |
UU0265 # 01 Y:2025 | 01 | 2025 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $10,697 | $45,926 | n/a |
UU0265 # 02 Y:2025 | 02 | 2025 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,450 | $9,720 | n/a |
UU0265 # 03 Y:2025 | 03 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,938 | $15,980 | n/a |
UU0265 # 04 Y:2025 | 04 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $1,620 | $14,000 | n/a |
UU0265 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,000 | $5,450 | n/a |
UU0265 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $546 | $1,620 | n/a |
UU0265 # 05 Y:2025 | 05 | 2025 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $1,338 | $5,515 | n/a |
UU0265 # 09 Y:2025 | 09 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $119 | $551 | n/a |
UU0264 # 05 Y:2025 | 05 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $3,332 | $4,000 | n/a |
UU0264 # 01 Y:2025 | 01 | 2025 | INSTALL AUTOMATIC BOILER FUEL FEED SYSTEM | $79,422 | $143,652 | n/a |
UU0264 # 02 Y:2025 | 02 | 2025 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $215,672 | $730,950 | n/a |
UU0264 # 03 Y:2025 | 03 | 2025 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $729,671 | $3,645,455 | n/a |
UU0264 # 04 Y:2025 | 04 | 2025 | REPLACE BOILER | $379,077 | $4,080,441 | n/a |
UU0264 # 06 Y:2025 | 06 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,905 | $7,317 | n/a |
UU0264 # 11 Y:2025 | 11 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $44,506 | $432,000 | n/a |
UU0264 # 10 Y:2025 | 10 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $515 | $916 | n/a |
UU0264 # 09 Y:2025 | 09 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $44,517 | $717,537 | n/a |