Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
249
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW2412 # 06 Y:2024 | 06 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,451 | $2,000 | Implemented |
UW2412 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,336 | $2,080 | Implemented |
UW2412 # 08 Y:2024 | 08 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,736 | $2,075 | Implemented |
UW2412 # 02 Y:2024 | 02 | 2024 | INSULATE BARE EQUIPMENT | $815 | $4,530 | Implemented |
UW2412 # 05 Y:2024 | 05 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,420 | $1,600 | Implemented |
UW2412 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,335 | $0 | Implemented |
UW2412 # 07 Y:2024 | 07 | 2024 | INSTALL OCCUPANCY SENSORS | $8,042 | $6,294 | Implemented |
UW2412 # 01 Y:2024 | 01 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $6,073 | $3,600 | Implemented |
UW2409 # 03 Y:2024 | 03 | 2024 | TREAT AND REUSE RINSE WATERS | $1,034,601 | $300,000 | Implemented |
UW2409 # 06 Y:2024 | 06 | 2024 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $72,261 | $271,830 | Implemented |
UW2409 # 02 Y:2024 | 02 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $1,927 | $2,080 | Implemented |
UW2409 # 05 Y:2024 | 05 | 2024 | REPLACE BOILER | $61,679 | $155,400 | Implemented |
UW2409 # 07 Y:2024 | 07 | 2024 | INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK | $24,670 | $223,625 | Implemented |
UW2409 # 04 Y:2024 | 04 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $16,446 | $18,600 | Implemented |
UW2409 # 01 Y:2024 | 01 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $240,871 | $7,750 | Implemented |
UW2411 # 03 Y:2024 | 03 | 2024 | UPGRADE OBSOLETE EQUIPMENT | $2,275 | $0 | Implemented |
UW2411 # 02 Y:2024 | 02 | 2024 | REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE | $5,536 | $0 | Implemented |
UW2411 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $177 | $715 | Implemented |
UW2410 # 04 Y:2024 | 04 | 2024 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $10,200 | $60,000 | Implemented |
UW2410 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $64,748 | $539,875 | Implemented |
UW2410 # 01 Y:2024 | 01 | 2024 | INSTALL EQUIPMENT TO MOVE PRODUCT | $855,879 | $575,120 | Implemented |
UW2410 # 07 Y:2024 | 07 | 2024 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,810 | $16,232 | Implemented |
UW2410 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,253 | $17,069 | Implemented |
UW2410 # 03 Y:2024 | 03 | 2024 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $131,806 | $610,500 | Implemented |
UW2410 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,418 | $25,000 | Implemented |