Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
75
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW2412 # 06 Y:2024 | 06 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,451 | $2,000 | n/a |
UW2412 # 05 Y:2024 | 05 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,420 | $1,600 | n/a |
UW2412 # 02 Y:2024 | 02 | 2024 | INSULATE BARE EQUIPMENT | $815 | $4,530 | n/a |
UW2412 # 01 Y:2024 | 01 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $6,073 | $3,600 | n/a |
UW2412 # 08 Y:2024 | 08 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,736 | $2,075 | n/a |
UW2412 # 07 Y:2024 | 07 | 2024 | INSTALL OCCUPANCY SENSORS | $8,042 | $6,294 | n/a |
UW2412 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,335 | $0 | n/a |
UW2412 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,336 | $2,080 | n/a |
UW2409 # 07 Y:2024 | 07 | 2024 | INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK | $24,670 | $223,625 | n/a |
UW2409 # 04 Y:2024 | 04 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $16,446 | $18,600 | n/a |
UW2409 # 02 Y:2024 | 02 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $1,927 | $2,080 | n/a |
UW2409 # 03 Y:2024 | 03 | 2024 | TREAT AND REUSE RINSE WATERS | $1,034,601 | $300,000 | n/a |
UW2409 # 01 Y:2024 | 01 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $240,871 | $7,750 | n/a |
UW2409 # 06 Y:2024 | 06 | 2024 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $72,261 | $271,830 | n/a |
UW2409 # 05 Y:2024 | 05 | 2024 | REPLACE BOILER | $61,679 | $155,400 | n/a |
UW2410 # 01 Y:2024 | 01 | 2024 | INSTALL EQUIPMENT TO MOVE PRODUCT | $855,879 | $575,120 | n/a |
UW2410 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,418 | $25,000 | n/a |
UW2410 # 03 Y:2024 | 03 | 2024 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $131,806 | $610,500 | n/a |
UW2410 # 04 Y:2024 | 04 | 2024 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $10,200 | $60,000 | n/a |
UW2410 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $64,748 | $539,875 | n/a |
UW2410 # 07 Y:2024 | 07 | 2024 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,810 | $16,232 | n/a |
UW2410 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,253 | $17,069 | n/a |
UW2408 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $32,306 | $2,080 | n/a |
UW2408 # 07 Y:2024 | 07 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $34,834 | $133,560 | n/a |
UW2408 # 08 Y:2024 | 08 | 2024 | INSULATE FEEDWATER TANK | $2,901 | $290 | n/a |