IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,298

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0225 # 01 Y:1994 01 1994 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $19,333 $0 Not Implemented
WI0225 # 02 Y:1994 02 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,987 $0 Not Implemented
WI0225 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,909 $1,280 Implemented
WI0225 # 04 Y:1994 04 1994 INSULATE BARE EQUIPMENT $2,110 $1,365 Implemented
WI0225 # 05 Y:1994 05 1994 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $291,000 $100,000 Not Implemented
WI0225 # 06 Y:1994 06 1994 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $4,870 $6,000 Not Implemented
WI0224 # 01 Y:1994 01 1994 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $12,194 $20,000 n/a
WI0224 # 02 Y:1994 02 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,980 $15,000 n/a
WI0224 # 03 Y:1994 03 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,846 $500 n/a
WI0224 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,264 $964 n/a
WI0224 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $272 $0 n/a
WI0224 # 06 Y:1994 06 1994 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $8,033 $0 n/a
WI0223 # 01 Y:1994 01 1994 REPLACE BOILER $3,696 $6,500 Not Implemented
WI0223 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,412 $2,989 Not Implemented
WI0223 # 03 Y:1994 03 1994 INSTALL OCCUPANCY SENSORS $228 $225 Not Implemented
WI0223 # 04 Y:1994 04 1994 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $1,910 $0 Implemented
WI0223 # 05 Y:1994 05 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $816 $0 Implemented
WI0223 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $332 $640 Not Implemented
WI0218 # 01 Y:1994 01 1994 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,760 $8,532 Implemented
WI0218 # 02 Y:1994 02 1994 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $7,498 $0 Implemented
WI0218 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,927 $4,569 Not Implemented
WI0218 # 04 Y:1994 04 1994 INSTALL OCCUPANCY SENSORS $518 $300 Not Implemented
WI0218 # 05 Y:1994 05 1994 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $1,260 $1,000 Not Implemented
WI0218 # 06 Y:1994 06 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,148 $500 Implemented
WI0218 # 07 Y:1994 07 1994 RECOVER WASTE HEAT FROM EQUIPMENT $663 $500 Not Implemented