IAC logo
IAC Assessment: WI0218
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0218
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1994
Principal Product Trade show exhibit booths
NAICS n/a
SIC 3993 - Signs And Advertising Specialities
Sales $10,000,000-$50,000,000
# of Employees 73
Plant Area (Sq.Ft.) 15,000
Annual Production 24 Pieces
Production Hrs. Annual 2,000
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $61,641 766,706 kWh $0.08
Natural Gas $46,419 11,559 MMBtu $4.02
TOTAL ENERGY COSTS $108,060
RECOMMENDED SAVINGS* $18,781 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,406
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$4,760
Cost:
$8,532
$(-193) (-2,345) $4,953 985 $(-193)
(-2,345)
kWh
$4,953
985
MMBtu
02: 2.3135 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS Savings:
$7,498
Cost:
-
$7,498 - - - $7,498
-
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,927
Cost:
$4,569
$1,927 24,033 - - $1,927
24,033
kWh
-
-
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$518
Cost:
$300
$518 6,448 - - $518
6,448
kWh
-
-
MMBtu
05: 2.6241 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY Savings:
$1,260
Cost:
$1,000
$1,260 46,600 - - $1,260
46,600
kWh
-
-
MMBtu
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,148
Cost:
$500
- - $1,148 286 -
-
kWh
$1,148
286
MMBtu
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$663
Cost:
$500
- - $663 165 -
-
kWh
$663
165
MMBtu
08: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,007
Cost:
$1,980
- - $1,007 251 -
-
kWh
$1,007
251
MMBtu
TOTAL RECOMMENDED Savings:
$18,781
Cost:
$17,381
$11,010 74,736 $7,771 1,687 $11,010
74,736
kWh
$7,771
1,687
MMBtu
TOTAL IMPLEMENTED Savings:
$13,406
Cost:
$9,032
$7,305 (-2,345) $6,101 1,271 $7,305
(-2,345)
kWh
$6,101
1,271
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas