IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,298

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0180 # 05 Y:1993 05 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,804 $18,262 Implemented
WI0180 # 06 Y:1993 06 1993 INSULATE BARE EQUIPMENT $2,007 $51 Implemented
WI0180 # 07 Y:1993 07 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,220 $0 Not Implemented
WI0180 # 08 Y:1993 08 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,009 $1,067 Not Implemented
WI0180 # 09 Y:1993 09 1993 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,744 $2,800 Not Implemented
WI0180 # 10 Y:1993 10 1993 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,494 $0 Implemented
WI0180 # 11 Y:1993 11 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,167 $10,000 Not Implemented
WI0180 # 12 Y:1993 12 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $498 $500 Implemented
WI0180 # 13 Y:1993 13 1993 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,451 $3,410 Not Implemented
WI0180 # 14 Y:1993 14 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $841 $900 Not Implemented
WI0180 # 15 Y:1993 15 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $730 $700 Not Implemented
WI0179 # 01 Y:1993 01 1993 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,974 $4,960 Not Implemented
WI0179 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,295 $5,659 Not Implemented
WI0179 # 03 Y:1993 03 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,270 $0 Implemented
WI0179 # 04 Y:1993 04 1993 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,354 $2,800 Not Implemented
WI0179 # 05 Y:1993 05 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $776 $500 Not Implemented
WI0179 # 06 Y:1993 06 1993 CONSIDER THREE OR FOUR DAYS AROUND-THE-CLOCK OPERATION RATHER THAN ONE OR TWO SHIFTS PER DAY $736 $0 Not Implemented
WI0179 # 07 Y:1993 07 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $625 $700 Implemented
WI0179 # 08 Y:1993 08 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $158 $640 Not Implemented
WI0177 # 01 Y:1993 01 1993 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,682 $5,600 Not Implemented
WI0177 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,476 $4,167 Implemented
WI0177 # 03 Y:1993 03 1993 INSTALL OCCUPANCY SENSORS $797 $1,100 Implemented
WI0177 # 04 Y:1993 04 1993 USE PHOTOCELL CONTROLS $175 $400 Implemented
WI0177 # 05 Y:1993 05 1993 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,662 $400 Not Implemented
WI0177 # 06 Y:1993 06 1993 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $1,065 $4,600 Not Implemented