IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,298

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0267 # 06 Y:1996 06 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $6,670 $0 n/a
WI0267 # 07 Y:1996 07 1996 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $4,867 $0 n/a
WI0267 # 08 Y:1996 08 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,040 $0 n/a
WI0267 # 09 Y:1996 09 1996 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,236 $5,000 n/a
WI0266 # 01 Y:1996 01 1996 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $6,680 $2,500 Not Implemented
WI0266 # 02 Y:1996 02 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,481 $30,000 Not Implemented
WI0266 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,572 $1,280 Implemented
WI0266 # 04 Y:1996 04 1996 RECOVER WASTE HEAT FROM EQUIPMENT $899 $600 Not Implemented
WI0266 # 05 Y:1996 05 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,072 $1,800 Implemented
WI0266 # 06 Y:1996 06 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $150 $250 Implemented
WI0266 # 07 Y:1996 07 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,546 $1,220 Implemented
WI0266 # 08 Y:1996 08 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $440 $0 Implemented
WI0265 # 01 Y:1996 01 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $35,546 $60,000 Implemented
WI0265 # 02 Y:1996 02 1996 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,889 $0 Not Implemented
WI0265 # 03 Y:1996 03 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,667 $8,000 Not Implemented
WI0265 # 04 Y:1996 04 1996 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $6,626 $27,600 Not Implemented
WI0265 # 05 Y:1996 05 1996 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $3,490 $6,500 Implemented
WI0265 # 06 Y:1996 06 1996 INSTALL TIMERS AND/OR THERMOSTATS $2,039 $6,400 Implemented
WI0265 # 07 Y:1996 07 1996 RECOVER AND REUSE COOLING WATER $1,750 $6,000 Not Implemented
WI0265 # 08 Y:1996 08 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $954 $4,000 Not Implemented
WI0265 # 09 Y:1996 09 1996 TURN OFF EQUIPMENT WHEN NOT IN USE $1,135 $0 Not Implemented
WI0265 # 10 Y:1996 10 1996 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $718 $0 Not Implemented
WI0265 # 11 Y:1996 11 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $500 $2,000 Not Implemented
WI0264 # 01 Y:1996 01 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,441 $10,000 Not Implemented
WI0264 # 02 Y:1996 02 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,580 $3,500 Not Implemented