IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

251

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0253 # 06 Y:1995 06 1995 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $1,958 $0 n/a
WI0253 # 04 Y:1995 04 1995 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,365 $7,000 n/a
WI0253 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,306 $7,683 n/a
WI0253 # 09 Y:1995 09 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,860 $0 n/a
WI0253 # 07 Y:1995 07 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $540 $960 n/a
WI0253 # 05 Y:1995 05 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,029 $2,000 n/a
WI0253 # 08 Y:1995 08 1995 INSULATE BARE EQUIPMENT $369 $49 n/a
WI0253 # 03 Y:1995 03 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,174 $0 n/a
WI0253 # 01 Y:1995 01 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $6,770 $0 n/a
WI0255 # 04 Y:1995 04 1995 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,521 $0 n/a
WI0255 # 06 Y:1995 06 1995 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $1,281 $3,600 n/a
WI0255 # 10 Y:1995 10 1995 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $5,100 $0 n/a
WI0255 # 09 Y:1995 09 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $615 $0 n/a
WI0255 # 02 Y:1995 02 1995 INSTALL OCCUPANCY SENSORS $1,141 $300 n/a
WI0255 # 08 Y:1995 08 1995 USE OPTIMUM THICKNESS INSULATION $671 $1,067 n/a
WI0255 # 03 Y:1995 03 1995 SHUT OFF AIR CONDITIONING IN WINTER HEATING SEASON $2,897 $6,500 n/a
WI0255 # 05 Y:1995 05 1995 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,060 $0 n/a
WI0255 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,156 $4,639 n/a
WI0255 # 11 Y:1995 11 1995 RECOVER AND REUSE WASTE MATERIAL $1,150 $0 n/a
WI0255 # 07 Y:1995 07 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $808 $950 n/a
WI0249 # 04 Y:1995 04 1995 RECOVER WASTE HEAT FROM EQUIPMENT $1,153 $250 Implemented
WI0249 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $488 $97 Not Implemented
WI0249 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,781 $150 Not Implemented
WI0249 # 06 Y:1995 06 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $359 $0 Not Implemented
WI0249 # 01 Y:1995 01 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,906 $4,500 Not Implemented