Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
188
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0503 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,506 | $0 | Not Implemented |
WI0503 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,209 | $21,960 | Not Implemented |
WI0503 # 04 Y:2005 | 04 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,112 | $1,000 | Not Implemented |
WI0503 # 07 Y:2005 | 07 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,742 | $4,900 | Not Implemented |
WI0503 # 06 Y:2005 | 06 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,350 | $640 | Not Implemented |
WI0503 # 01 Y:2005 | 01 | 2005 | IMPROVE SPACE COMFORT CONDITIONING | $47,772 | $9,625 | Not Implemented |
WI0503 # 03 Y:2005 | 03 | 2005 | USE OPTIMUM THICKNESS INSULATION | $8,005 | $7,500 | Not Implemented |
WI0502 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,862 | $27,000 | Not Implemented |
WI0502 # 08 Y:2005 | 08 | 2005 | IMPROVE LUBRICATION PRACTICES | $1,579 | $1,238 | Not Implemented |
WI0502 # 09 Y:2005 | 09 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,524 | $1,280 | Not Implemented |
WI0502 # 07 Y:2005 | 07 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,670 | $520 | Not Implemented |
WI0502 # 04 Y:2005 | 04 | 2005 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,880 | $0 | Not Implemented |
WI0502 # 03 Y:2005 | 03 | 2005 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,880 | $0 | Not Implemented |
WI0502 # 02 Y:2005 | 02 | 2005 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,177 | $9,500 | Not Implemented |
WI0502 # 10 Y:2005 | 10 | 2005 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $1,374 | $1,500 | Not Implemented |
WI0502 # 05 Y:2005 | 05 | 2005 | INSTALL TIMERS AND/OR THERMOSTATS | $2,699 | $0 | Not Implemented |
WI0502 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,919 | $0 | Not Implemented |
WI0501 # 04 Y:2005 | 04 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,873 | $0 | Not Implemented |
WI0501 # 06 Y:2005 | 06 | 2005 | USE SYNTHETIC LUBRICANT | $921 | $800 | Not Implemented |
WI0501 # 03 Y:2005 | 03 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,905 | $0 | Not Implemented |
WI0501 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,224 | $19,800 | Not Implemented |
WI0501 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,008 | $0 | Not Implemented |
WI0501 # 02 Y:2005 | 02 | 2005 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $16,037 | $30,800 | Not Implemented |
WI0500 # 06 Y:2005 | 06 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,252 | $2,032 | n/a |
WI0500 # 01 Y:2005 | 01 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $57,577 | $25,000 | n/a |