IAC logo
IAC Assessment: WI0503
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0503
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2005
Principal Product Electronic Assemblies
NAICS 334519 - Other Measuring and Controlling Device Manufacturing
SIC 3873 - Watches, Clocks, Watchcases & Parts
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 55,000
Annual Production 0 Units
Production Hrs. Annual 6,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $88,586 2,349,478 kWh $0.04
Electricity Demand $49,589 5,204 kW-months/year $9.53
Natural Gas $18,467 1,920 MMBtu $9.62
TOTAL ENERGY COSTS $156,642
RECOMMENDED SAVINGS* $78,696 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 4.4240 IMPROVE SPACE COMFORT CONDITIONING Savings:
$47,772
Cost:
$9,625
- - - - - - $47,772 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$47,772
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,209
Cost:
$21,960
$7,138 179,340 $4,071 359 - - - - $7,138
179,340
kWh
$4,071
359
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$8,005
Cost:
$7,500
- - - - $8,005 832 - - -
-
kWh
-
-
kW-months/year
$8,005
832
MMBtu
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,112
Cost:
$1,000
- - - - $5,112 531 - - -
-
kWh
-
-
kW-months/year
$5,112
531
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,506
Cost:
-
$1,069 26,856 $437 60 - - - - $1,069
26,856
kWh
$437
60
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,350
Cost:
$640
$838 21,059 $512 47 - - - - $838
21,059
kWh
$512
47
kW-months/year
-
-
MMBtu
-
-
$
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,742
Cost:
$4,900
$2,088 52,453 $1,654 146 - - - - $2,088
52,453
kWh
$1,654
146
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$78,696
Cost:
$45,625
$11,133 279,708 $6,674 612 $13,117 1,363 $47,772 - $11,133
279,708
kWh
$6,674
612
kW-months/year
$13,117
1,363
MMBtu
$47,772
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes