Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,780
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0210 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $12,043 | $21,250 | Not Implemented |
WM0210 # 02 Y:2024 | 02 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,116 | $0 | Not Implemented |
WM0210 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,452 | $0 | Not Implemented |
WM0210 # 05 Y:2024 | 05 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,410 | $7,096 | Implemented |
WM0210 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $2,041 | $278 | Not Implemented |
WM0210 # 07 Y:2024 | 07 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $566 | $1,050 | Not Implemented |
WM0210 # 08 Y:2024 | 08 | 2024 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $564 | $1,417 | Not Implemented |
WM0210 # 09 Y:2024 | 09 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $277 | $0 | Not Implemented |
WM0209 # 05 Y:2024 | 05 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,224 | $0 | Not Implemented |
WM0209 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,372 | $0 | Not Implemented |
WM0209 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,061 | $3,250 | Implemented |
WM0209 # 02 Y:2024 | 02 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $7,576 | $1,700 | Implemented |
WM0209 # 01 Y:2024 | 01 | 2024 | PAY BILLS ON TIME TO AVOID LATE FEES | $9,737 | $0 | Implemented |
WM0208 # 07 Y:2024 | 07 | 2024 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $430 | $700 | Implemented |
WM0208 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,014 | $4,664 | Implemented |
WM0208 # 05 Y:2024 | 05 | 2024 | USE COMPRESSOR AIR FILTERS | $3,395 | $4,786 | Not Implemented |
WM0208 # 04 Y:2024 | 04 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,796 | $0 | Not Implemented |
WM0208 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,761 | $1,950 | Implemented |
WM0208 # 02 Y:2024 | 02 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $9,702 | $8,700 | Implemented |
WM0208 # 01 Y:2024 | 01 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $37,878 | $122,100 | Not Implemented |
WM0207 # 05 Y:2024 | 05 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,225 | $1,100 | Implemented |
WM0207 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $3,129 | $540 | Not Implemented |
WM0207 # 03 Y:2024 | 03 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,619 | $4,084 | Implemented |
WM0207 # 02 Y:2024 | 02 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $16,759 | $2,500 | Not Implemented |
WM0207 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,028 | $12,825 | Implemented |