IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0437 # 04 Y:2011 04 2011 UPGRADE CONTROLS ON COMPRESSORS $3,937 $18,000 Not Implemented
WV0437 # 05 Y:2011 05 2011 DEVELOP A REPAIR/REPLACE POLICY $2,985 $613 Implemented
WV0437 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,934 $5,194 Implemented
WV0437 # 07 Y:2011 07 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,803 $1,613 Implemented
WV0437 # 08 Y:2011 08 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,837 $1,119 Implemented
WV0437 # 09 Y:2011 09 2011 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,451 $4,200 Not Implemented
WV0401 # 01 Y:2010 01 2010 RECOVER WASTE HEAT FROM EQUIPMENT $61,713 $37,440 Not Implemented
WV0401 # 02 Y:2010 02 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $57,379 $6,240 Implemented
WV0401 # 03 Y:2010 03 2010 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $38,419 $128,000 Implemented
WV0401 # 04 Y:2010 04 2010 DEVELOP A REPAIR/REPLACE POLICY $19,593 $1,638 Not Implemented
WV0401 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,792 $7,958 Implemented
WV0401 # 06 Y:2010 06 2010 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $11,226 $20,400 Implemented
WV0401 # 07 Y:2010 07 2010 INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS $7,432 $16,240 Not Implemented
WV0401 # 08 Y:2010 08 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,432 $2,028 Implemented
WV0401 # 09 Y:2010 09 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,622 $312 Implemented
WV0401 # 10 Y:2010 10 2010 IMPROVE LUBRICATION PRACTICES $3,683 $858 Not Implemented
WV0401 # 11 Y:2010 11 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,378 $936 Not Implemented
WV0401 # 12 Y:2010 12 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,182 $2,886 Implemented
WV0401 # 13 Y:2010 13 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,239 $1,000 Implemented
WV0401 # 14 Y:2010 14 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $536 $52 Implemented
WV0391 # 01 Y:2009 01 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $27,893 $26,000 Not Implemented
WV0391 # 02 Y:2009 02 2009 USE PHOTOCELL CONTROLS $11,811 $6,850 Not Implemented
WV0391 # 03 Y:2009 03 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,520 $800 Implemented
WV0391 # 04 Y:2009 04 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,238 $8,890 Not Implemented
WV0391 # 05 Y:2009 05 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,896 $8,900 Not Implemented