IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0347 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,154 $8,175 Implemented
MA0347 # 06 Y:1995 06 1995 FILTER AND REUSE HYDRAULIC OIL $29,912 $51,750 Implemented
MA0342 # 01 Y:1995 01 1995 OPTIMIZE PLANT POWER FACTOR $10,527 $8,100 Implemented
MA0342 # 04 Y:1995 04 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,836 $0 Implemented
MA0342 # 05 Y:1995 05 1995 RECOVER WASTE HEAT FROM EQUIPMENT $3,525 $3,443 Implemented
MA0342 # 08 Y:1995 08 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $797 $0 Implemented
MA0333 # 02 Y:1995 02 1995 OPTIMIZE PLANT POWER FACTOR $4,592 $9,500 Implemented
MA0333 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $588 $800 Implemented
MA0333 # 05 Y:1995 05 1995 RECOVER WASTE HEAT FROM EQUIPMENT $412 $461 Implemented
MA0332 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $382 $100 Implemented
MA0332 # 02 Y:1995 02 1995 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,059 $150 Implemented
MA0332 # 01 Y:1995 01 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $2,291 $0 Implemented
MA0332 # 04 Y:1995 04 1995 RECOVER WASTE HEAT FROM EQUIPMENT $300 $500 Implemented
MA0331 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,525 $5,100 Implemented
MA0331 # 03 Y:1995 03 1995 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $731 $0 Implemented
MA0331 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $475 $0 Implemented
MA0331 # 05 Y:1995 05 1995 INSTALL OCCUPANCY SENSORS $398 $422 Implemented
MA0328 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,528 $44,433 Implemented
MA0328 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,889 $540 Implemented
MA0328 # 05 Y:1995 05 1995 USE PHOTOCELL CONTROLS $1,851 $286 Implemented
MA0328 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $985 $1,440 Implemented
MA0328 # 08 Y:1995 08 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $477 $0 Implemented
MA0328 # 13 Y:1995 13 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,755 $16,400 Implemented
MA0327 # 08 Y:1995 08 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,903 $1,500 Implemented
MA0327 # 09 Y:1995 09 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,213 $0 Implemented