IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,681

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0049 # 01 Y:2002 01 2002 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $1,206,000 $100 Implemented
MI0049 # 06 Y:2002 06 2002 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $3,658 $3,000 Implemented
MI0048 # 01 Y:2002 01 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,989,000 $115,000 Implemented
MI0048 # 05 Y:2002 05 2002 ADD AREA LIGHTING SWITCHES $1,911 $350 Implemented
UF0309 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,113 $340 Implemented
UF0309 # 02 Y:2002 02 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,774 $3,840 Implemented
UF0309 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,173 $23,719 Implemented
UF0309 # 09 Y:2002 09 2002 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME $8,100 $2,160 Implemented
MI0047 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,225 $52 Implemented
UF0307 # 01 Y:2002 01 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $26,416 $12,233 Implemented
UF0307 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,706 $107,644 Implemented
UF0304 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,492 $10,725 Implemented
UF0304 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $29,432 $110,539 Implemented
UF0304 # 05 Y:2002 05 2002 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $7,014 $0 Implemented
UF0304 # 07 Y:2002 07 2002 CHANGE OPERATING CONDITIONS $6,000 $472 Implemented
UF0305 # 01 Y:2002 01 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,112 $0 Implemented
UF0305 # 02 Y:2002 02 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,516 $7,336 Implemented
UF0305 # 04 Y:2002 04 2002 REPAIR AND ELIMINATE STEAM LEAKS $9,803 $75 Implemented
UF0305 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,910 $0 Implemented
MI0046 # 02 Y:2002 02 2002 INSTALL BACK-UP EQUIPMENT $27,428 $936 Implemented
MI0046 # 03 Y:2002 03 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $16,162 $1,016 Implemented
MI0046 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,120 $1,068 Implemented
MI0046 # 05 Y:2002 05 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $7,998 $8 Implemented
MI0045 # 01 Y:2002 01 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $315,000 $75,000 Implemented
MI0045 # 02 Y:2002 02 2002 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $20,280 $650 Implemented