IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73,325

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0250 # 07 Y:2021 07 2021 OPTIMIZE PLANT POWER FACTOR $43,918 $57,938 Implemented
MZ0321 # 01 Y:2021 01 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,197 $657 Implemented
MZ0321 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,760 $11,000 Implemented
MZ0321 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $46,936 $63,900 Implemented
MZ0321 # 04 Y:2021 04 2021 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $23,778 $5,120 Implemented
MZ0324 # 01 Y:2021 01 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,260 $480 Implemented
MZ0324 # 02 Y:2021 02 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,050 $7,800 Implemented
MZ0324 # 03 Y:2021 03 2021 INSTALL OCCUPANCY SENSORS $269 $340 Implemented
MZ0324 # 04 Y:2021 04 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,278 $240 Implemented
LS0322 # 01 Y:2022 01 2022 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $34,447 $250 Implemented
LS0322 # 02 Y:2022 02 2022 AIR CONDITION ONLY SPACE NECESSARY $29,784 $250 Implemented
LS0322 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $128 $195 Implemented
LS0222 # 02 Y:2022 02 2022 USE PHOTOCELL CONTROLS $1,324 $407 Implemented
LS0222 # 03 Y:2022 03 2022 REDUCE HEAT GAIN BY WINDOW TINTING $6,372 $2,100 Implemented
LS0222 # 04 Y:2022 04 2022 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $430 $300 Implemented
LS0222 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $160 $306 Implemented
LE0517 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $603 $40 Implemented
LE0517 # 03 Y:2022 03 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $52,000 $100,000 Implemented
LE0517 # 06 Y:2022 06 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $125 $480 Implemented
LS0122 # 01 Y:2022 01 2022 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $13,696 $0 Implemented
LS0122 # 02 Y:2022 02 2022 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $942 $300 Implemented
LS0122 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $1,436 $575 Implemented
LS0122 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,495 $39,219 Implemented
LS0122 # 05 Y:2022 05 2022 USE OPTIMUM THICKNESS INSULATION $2,779 $6,297 Implemented
LS2209 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,222 $5,575 Implemented