IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,631

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0310 # 02 Y:1990 02 1990 SHUT OFF PILOTS IN STANDBY EQUIPMENT $862 $0 Implemented
UD0310 # 03 Y:1990 03 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $170 $0 Implemented
UD0310 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,326 $442 Implemented
UD0310 # 05 Y:1990 05 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $907 $1,800 Implemented
UD0307 # 01 Y:1990 01 1990 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $4,728 $100 Implemented
UD0302 # 01 Y:1990 01 1990 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,135 $0 Implemented
UD0302 # 02 Y:1990 02 1990 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $4,863 $4,000 Implemented
UD0303 # 01 Y:1990 01 1990 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $2,148 $0 Implemented
UD0303 # 02 Y:1990 02 1990 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $761 $800 Implemented
UD0303 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,496 $3,102 Implemented
UD0304 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,928 $4,920 Implemented
UD0304 # 04 Y:1990 04 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $332 $0 Implemented
UD0304 # 05 Y:1990 05 1990 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,558 $1,500 Implemented
UD0298 # 01 Y:1989 01 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $979 $2,250 Implemented
UD0299 # 02 Y:1989 02 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $900 $0 Implemented
UD0299 # 03 Y:1989 03 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,667 $750 Implemented
UD0299 # 04 Y:1989 04 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $889 $750 Implemented
UD0299 # 05 Y:1989 05 1989 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,588 $1,720 Implemented
UD0301 # 05 Y:1990 05 1990 INSTALL SET-BACK TIMERS $1,252 $0 Implemented
UD0301 # 06 Y:1990 06 1990 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,399 $0 Implemented
UD0301 # 07 Y:1990 07 1990 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,574 $5,000 Implemented
UD0301 # 08 Y:1990 08 1990 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,095 $7,500 Implemented
UD0294 # 01 Y:1989 01 1989 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $464 $0 Implemented
UD0290 # 01 Y:1989 01 1989 COMBINE UTILITY METERS $2,104 $1,000 Implemented
UD0290 # 04 Y:1989 04 1989 KEEP LAMPS AND REFLECTORS CLEAN $6,394 $11,600 Implemented