IAC logo
IAC Assessment: UD0333
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0333
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1991
Principal Product WELDED STEEL TUBING
NAICS n/a
SIC 3312 - Blast Furnaces And Steel Mills
Sales $10,000,000-$50,000,000
# of Employees 163
Plant Area (Sq.Ft.) 0
Annual Production 800 Thousand Feet
Production Hrs. Annual 6,240
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $277,485 5,502,052 kWh $0.05
Natural Gas $106,452 26,875 MMBtu $3.96
Fuel Oil #2 $15,029 2,744 MMBtu $5.48
TOTAL ENERGY COSTS $398,966
RECOMMENDED SAVINGS* $185,866 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $185,866
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS Savings:
$2,221
Cost:
$6,000
- - $(-4,187) (-997) $6,408 997 - - -
-
kWh
$(-4,187)
(-997)
MMBtu
$6,408
997
MMBtu
-
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$145,812
Cost:
-
$15,812 418,523 - - - - $130,000 - $15,812
418,523
kWh
-
-
MMBtu
-
-
MMBtu
$130,000
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,976
Cost:
-
$2,976 - - - - - - - $2,976
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
04: 2.6241 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY Savings:
$34,857
Cost:
-
- - $34,857 9,959 - - - - -
-
kWh
$34,857
9,959
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$185,866
Cost:
$6,000
$18,788 418,523 $30,670 8,962 $6,408 997 $130,000 - $18,788
418,523
kWh
$30,670
8,962
MMBtu
$6,408
997
MMBtu
$130,000
-
$
TOTAL IMPLEMENTED Savings:
$185,866
Cost:
$6,000
$18,788 418,523 $30,670 8,962 $6,408 997 $130,000 - $18,788
418,523
kWh
$30,670
8,962
MMBtu
$6,408
997
MMBtu
$130,000
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes