Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 1991 |
Principal Product | WELDED STEEL TUBING |
NAICS | n/a |
SIC | 3312 - Blast Furnaces And Steel Mills |
Sales | $10,000,000-$50,000,000 |
# of Employees | 163 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 800 Thousand Feet |
Production Hrs. Annual | 6,240 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $277,485 | 5,502,052 | kWh | $0.05 |
Natural Gas | $106,452 | 26,875 | MMBtu | $3.96 |
Fuel Oil #2 | $15,029 | 2,744 | MMBtu | $5.48 |
TOTAL ENERGY COSTS | $398,966 | |||
RECOMMENDED SAVINGS* | $185,866 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $185,866 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Fuel Oil #2 | Administrative Changes | Electricity Usage | Natural Gas | Fuel Oil #2 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS |
Savings: $2,221 Cost: $6,000 |
- | - | $(-4,187) | (-997) | $6,408 | 997 | - | - |
- - kWh |
$(-4,187) (-997) MMBtu |
$6,408 997 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $145,812 Cost: - |
$15,812 | 418,523 | - | - | - | - | $130,000 | - |
$15,812 418,523 kWh |
- - MMBtu |
- - MMBtu |
$130,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $2,976 Cost: - |
$2,976 | - | - | - | - | - | - | - |
$2,976 - kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6241 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY |
Savings: $34,857 Cost: - |
- | - | $34,857 | 9,959 | - | - | - | - |
- - kWh |
$34,857 9,959 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $185,866 Cost: $6,000 |
$18,788 | 418,523 | $30,670 | 8,962 | $6,408 | 997 | $130,000 | - | $18,788 418,523 kWh |
$30,670 8,962 MMBtu |
$6,408 997 MMBtu |
$130,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $185,866 Cost: $6,000 |
$18,788 | 418,523 | $30,670 | 8,962 | $6,408 | 997 | $130,000 | - | $18,788 418,523 kWh |
$30,670 8,962 MMBtu |
$6,408 997 MMBtu |
$130,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Fuel Oil #2 | Administrative Changes | Electricity Usage | Natural Gas | Fuel Oil #2 | Administrative Changes |