IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,264

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0209 # 04 Y:1994 04 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $437 $280 Implemented
AM0208 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $13,375 $16,000 Implemented
AM0208 # 02 Y:1994 02 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $6,550 $2,135 Implemented
AM0208 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,265 $5,320 Implemented
AM0208 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,570 $5,850 Implemented
AM0208 # 05 Y:1994 05 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $815 $1,535 Implemented
AM0205 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $14,843 $23,805 Implemented
AM0205 # 02 Y:1994 02 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,830 $0 Implemented
AM0205 # 03 Y:1994 03 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,430 $0 Implemented
AM0205 # 04 Y:1994 04 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,170 $630 Implemented
AM0205 # 05 Y:1994 05 1994 INSULATE BARE EQUIPMENT $3,660 $1,890 Implemented
AM0205 # 07 Y:1994 07 1994 INSULATE BARE EQUIPMENT $2,800 $490 Implemented
AM0205 # 08 Y:1994 08 1994 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $590 $80 Implemented
AM0205 # 09 Y:1994 09 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $433 $0 Implemented
AM0206 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,600 $11,590 Implemented
AM0206 # 04 Y:1994 04 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $2,840 $670 Implemented
AM0204 # 01 Y:1994 01 1994 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $3,520 $1,000 Implemented
AM0204 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,520 $1,500 Implemented
AM0204 # 03 Y:1994 03 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $660 $13 Implemented
AM0204 # 04 Y:1994 04 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $100 $185 Implemented
AM0204 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $102 $52 Implemented
AM0204 # 06 Y:1994 06 1994 FILTER AND REUSE HYDRAULIC OIL $1,800 $0 Implemented
AM0202 # 02 Y:1994 02 1994 OPTIMIZE PLANT POWER FACTOR $5,643 $21,675 Implemented
AM0202 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $915 $100 Implemented
AM0202 # 05 Y:1994 05 1994 USE SYNTHETIC LUBRICANT $445 $0 Implemented