IAC logo
IAC Assessment: KG0010
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KG0010
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, Kingsville
Assessment Year 1994
Principal Product Variety Juice & citrus pellets.
NAICS n/a
SIC 2033 - Canned Fruits And Vegetables
Sales $50,000,000-$100,000,000
# of Employees 150
Plant Area (Sq.Ft.) 189,162
Annual Production 1,500,000 Pieces
Production Hrs. Annual 7,024
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $393,657 5,727,726 kWh $0.07
Natural Gas $119,318 30,537 MMBtu $3.91
TOTAL ENERGY COSTS $512,975
RECOMMENDED SAVINGS* $53,790 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $31,619
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$23,359
Cost:
$48,100
$23,359 555,979 - - $23,359
555,979
kWh
-
-
MMBtu
02: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$21,337
Cost:
$1,260
$21,337 - - - $21,337
-
kWh
-
-
MMBtu
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$7,603
Cost:
$1,050
$7,603 266,120 - - $7,603
266,120
kWh
-
-
MMBtu
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$695
Cost:
$2,785
- - $695 169 -
-
kWh
$695
169
MMBtu
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$657
Cost:
$2,500
- - $657 166 -
-
kWh
$657
166
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$139
Cost:
$390
$139 4,982 - - $139
4,982
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$53,790
Cost:
$56,085
$52,438 827,081 $1,352 335 $52,438
827,081
kWh
$1,352
335
MMBtu
TOTAL IMPLEMENTED Savings:
$31,619
Cost:
$51,650
$30,962 822,099 $657 166 $30,962
822,099
kWh
$657
166
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas