IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73,576

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0278 # 03 Y:1989 03 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $472 $600 Implemented
KU0278 # 04 Y:1989 04 1989 REPAIR AND ELIMINATE STEAM LEAKS $295 $400 Implemented
KU0278 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,914 $6,334 Implemented
KU0278 # 07 Y:1989 07 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,384 $2,150 Implemented
KU0278 # 08 Y:1989 08 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $913 $0 Implemented
KU0278 # 09 Y:1989 09 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,213 $2,650 Implemented
KU0278 # 10 Y:1989 10 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $245 $200 Implemented
KU0279 # 01 Y:1989 01 1989 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $13,158 $32,000 Implemented
KU0279 # 02 Y:1989 02 1989 REPAIR AND ELIMINATE STEAM LEAKS $400 $500 Implemented
KU0279 # 03 Y:1989 03 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $774 $550 Implemented
KU0279 # 04 Y:1989 04 1989 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $730 $0 Implemented
KU0279 # 09 Y:1989 09 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,571 $0 Implemented
KU0280 # 02 Y:1989 02 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,382 $0 Implemented
KU0280 # 04 Y:1989 04 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $440 $100 Implemented
KU0280 # 05 Y:1989 05 1989 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $250 $0 Implemented
KU0280 # 07 Y:1989 07 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $143 $40 Implemented
MA0146 # 01 Y:1989 01 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,941 $0 Implemented
MA0146 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,156 $100 Implemented
MA0146 # 05 Y:1989 05 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $5,452 $2,816 Implemented
MA0146 # 07 Y:1989 07 1989 INSTALL EFFICIENT RECTIFIERS $15,154 $20,306 Implemented
MA0147 # 03 Y:1989 03 1989 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $144 $41 Implemented
MA0147 # 05 Y:1989 05 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $446 $331 Implemented
MA0147 # 06 Y:1989 06 1989 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,080 $0 Implemented
MA0148 # 03 Y:1989 03 1989 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $6,780 $7,000 Implemented
MA0148 # 07 Y:1989 07 1989 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $3,059 $2,300 Implemented